Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Roller Chain, Transmission Chain, Conveyor Chain manufacturer / supplier in China, offering Transmission Chain 60-1 for Roller Conveyor System, Hollow Pin Chains 40HP, Long Pitch Conveyor Chains M 112 / M80 and so on.

1
    YRS
General Supplier

Shock Absorber Auto Spare Parts of Piston Rod

Get Latest Price
Min. Order / Reference FOB Price
10 Pieces US $2.00/ Pieces
Local Area: Hangzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Brand: Yc
Part: Piston Rod
Position: Shock Absorber
Type: Piston
We offer a kind of piston rod for auto and motorcycle.
Product Description1materialStaninless steel 304.316, 303, 316L,
carbon steel C45, S235JR, 1008, 1010, 1040,
alloy steel, 5140, 4140,3415,2processCNC machining, MC machining, grinder machine,3StandardAmerican standard, ASTM, JIS, European standard, EN, DIN, BS
Ford Motor standard, General motors standard4CertificationISO9001, TS169495surfact treatmenthigh-frequency quenching HRC 50~60.
hard chromium plating,
roughness Min Ra0.08
Products Show Production equipmentMAIN MANUFACTURE QUIPMENT LISTMACHINETYPEQTY (SET)Drillerdeep hole drilling machineZ21155Vertical DrillingZ-5150A1Z-5140A38Z-5140B2Z-51501Pressed Thread MachinePressed Thread MachineZA28-31.51Z28-1251LatheRecording LatheCM0632BW65CJ063CM0636BW1General LatheCY61403CD6140A43CW6163C1C6136A21C6136A-11CH10-6162C61864X620JV3JXC6201simplified CNC lathCKJ614034CKJ6140A2CJK6135A1horizontal CNC lathCP6132A12CP613214CK61362vertical machine centerMXR-460V2vertical machine centerMXR-560V3Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment 30%TT in advance. 70% T/T before shippment