Dear sir/madam,The generator assemblyproducion lineconsists of the following process station:
1 Front cover bearing pressed machine,
2 bearing cover screw fastening machine,
3 stator center position fixed machine,
4 rotor loading machine,
5 generators rear cover loading machine,
6 front and rear cover screw tightening machine,
7 Withstanding voltage tester,
8 belt Pulley tightened machine,
9 belt pulley position detection machine,
10 injecting silica gel and regulator loading machine,
11 replacement of brush protecting cover,
12 stator lead wire welding machine,
13 rear cover loading machine,
14 generator testing machine
15 code markingThe machine can meet CE certifcaton.
Datasheet
1. Cycle time: ≤ 25S
2. Power voltage: Three-phase five-wire system 380V± 10% 50Hz
3. Gas source pressure: 0.4_0.7MPa
4. Application scope: Automobile generator assembly
Cycle TimePower VoltageFrequencyGas Source Pressure<=25sThree-Phase Five-Wire System 380V50Hz0.4_0.7mpa