Product DescriptionBiogas plant applied CE approved CHP cogeneration biogas generator 600kw1. +10 years gas engine manufacturer.
2. Wide power range: 10kw-700kw, single or parallel running.
3. Multi-option of engine, alternator, control system and cooling system, PLCcontrol panel.
4. Long continuous running hours, 8000 hours per year.
5. CE & ISO approved
6. OEM provided
Product FeaturesMain spare parts:1. Control system: America Woodward control system
2. Controller: ComAp, Deepsea, Woodward
3. Ignition system:AmericanALTRONIC, including:magneto, high-tensioncoil
4. Startingsystem:DC 24V electricmotor.
5. Mixer:IMPCO
6. Spark plug:STITT
Main technical parameters:Parameter of Biogas Generator SetModel Number (Engine Type)LHBG10-700Brand NameLVHUANPrime power/Standby power8kw-560kw/10kw-700kwRated Speed1000/1200-1500/1800 rpmRated Frequency50/60HzRated Voltage400V/230VPhaseAC 3-Phase, 4 wireVoltage Stability≤±2%Voltage transient≤±10%Voltage Stable time≤1sHeat consumption≤9.8mj/kw.hLubricant consumption≤1.0g/kw.hEngine Capacity1.81-71.45 LCylinder Number2-12Cylinder Bore100-190mmStroke115-210mmStarting SystemDC 24V electric motorCooling methodWater coolerLubricant methodPassive and flying lubricantIsolation classHProtectionIP23AlternatorSiemens, Standford, Leroy Somer, Marathon, etc.Power Factor0.8 laggingExciting methodbrushlessColouryour choiceCertificatesISO 9001:2008, CEWarranty1 yearTypeOpenControl systemAutomatic alarm systemSize1450x700x1100mm-6200x2100x2800mmWeight700kg-12500kgGenset worksite requirementsThe worksite needs to meet following basic requirements:
a) Ambient temperature between -40ºC~40ºC;
b) Relative humidity less than 95%(35ºC);
c) Site elevation not higher than 2500m;
d) For outdoor installation, simple rain shelter is required.
Gas requirements of genset1. Temperature of biogas≤40ºC
2. CH4 content of biogas≥40%, variation rate≤2%/min.
3. H2S≤200mg/Nm3
4. NH3≤20mg/Nm3
5. Impurities particle size≤5μm,impuritycontent≤30mg/Nm3
6.Moisture Content of biogas≤40g/Nm3
Purification of biogas has a significant impact on machine life and continuous running time!
Service committee:1. Pre-sale service:
1) Wewillsendourengineertoprospectthesiteofpowerstationfreeofcharge.
2) According to the situation of site, we will provide design drawings, such as power plant floor drawing, cooling system drawing, genset foundation, control room design, etc.2. Saleservice:
1) Operator training would be conducted by Lvhuan technicians during the process of commissioning or Factory training course in China,
2) Installation and commission of the genset would be instructed assisted by Lvhuan technicians at site.3. After-saleservice:
1) We have strong after-sale team, we will response within 24 hours and provide technical supports by phone or site guiding, help our clients to gain the biggeset profit.
2)Forthequalityproblem,wewillserviceforyoufreeofchargeduringtheguaranteeperiod.
3) We provide one yearguaranteeperiodandlifetimeservice.
Plentiful spare part supply:1. We have spart parts department, plentiful spare part supply for all genset model will guarantee genset lifetime running.
2. Allpartswerefromoriginalfactoriesorprofessionalfactories,completeinspecification, keepgoodquality.Product pictures:
Project pictures:
Spare parts supply:
Factory show:
Our certificate:
FAQ:
1. Are you factory? and where is your factory?
Yes, we are. Our factory is located in Zhangqiu Longshan subdistrict, Jinan city, Shandong province, Welcome to visit our factory.2. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.3.What's the genset warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.4. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.5. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.6. What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.7. What is your regular delivery time?
30 days after order releasing.
PLS FEEL FREE TO ASK FOR QUESTIONS AND QUOTATION!