Business Type:
Manufacturer/Factory,Trading Company
Business Range:
PVC Pipe Fitting, PVC Ball Valve, PVC Flange, True Union Valve, Butterfly Valve
Establishment:
2012
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion
Main Markets:
Europe, Africa, Domestic
OEM/ODM Service
Sample Available

Plastic Pipe Fittings, PVC Pipe Fittings, Plastic Decoration manufacturer / supplier in China, offering DIN Standard PVC Bushing 20mm-400mm for Connection, PPH True Union Ball Valve with 1/2′′-4′′ with Rubber, UPVC Coupling Adjustable Expansion Type with DIN Standard and so on.

1
    YRS
General Supplier

PVC Faucet Reducing Joint of Pipe Fitting

Get Latest Price
Min. Order / Reference FOB Price
5000 Piece US $0.04/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion
Connection: Welding
Kind: Rotating Compensator
Type: Horizontal
PVC pipe fitting twp faucet reducing joint
MATERIal: PVC
CONNECOR: cement
Standard: ISO4422, ISO1452, GBT10002
Size:75*63-355*315
Fittings are 100% inspected before delivery to customers with100% virgin material.
SizeSpec D1*D2SizeHh1h290*632101157690*7521211581.5110*6323012276110*90255123116160*110305140122200*110324156122200*160325155140225*110362160122225*160355160140225*200355160155250*110388175122250*160375175140250*200372175155250*225375175140315*160431195140315*200430195155315*250435195182355*200155205155355*315438205198Applicable places
1.Water supply engineering
2.Construction Engineering
3.Well Drilling Engineering
4.Salt Water Enguneering
5.Gas Supply Engineering
6.Chemical Engineering
7.Agricultural Ground
8.Mining Plant
9.Supply
10.Free Way Engineering
11.Golf Course EngineeringOther Rubber Fitting
Our Business Steps:
1)Communication: customers interest in our products , discuss price , check sample quality
2)Negotiation : talking about the sizes, quantity , and other details
3)Ordering: settle down and place order to us
4)Producing: after orders , we start productions at once
5)Packing: while products come out of machines then packed
6)Delivery : everything gets ready ,place the ship, send to dock , to be shipped