Business Type:
Manufacturer/Factory,Trading Company
Business Range:
FRP Products, Cooling Tower Fill
Establishment:
2014
R&D Capacity:
OEM
Terms of Payment:
LC, T/T
Main Markets:
Europe, Africa
OEM/ODM Service
Sample Available

GRP Grating, Fiberglass Grating, Flooring Grating manufacturer / supplier in China, offering Fiberglass Reinforced Molded Plastic Grating, 11mm*300m Fiberglass Push Pull Rod Wire Pulling Duct Rodder, 4.5mm Diameter Cobra Rod, Fiberglass Duct Rodder and so on.

1
    YRS
General Supplier

145mm Eac Cooling Tower Drift Eliminator

Get Latest Price
Min. Order / Reference FOB Price
20 Square Met US $25.00/ Square Met
Local Area: Shijiazhuang, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Cooling Method: Cross Flow
Ventilation Mode: Natural Ventilation
Material: PVC ,PP, PVC,PP

145mm Blade Drift Eliminator For Cooling Tower

Cooling tower drift eliminator are used to control water loss from a cooling tower by limiting the amount of circulating water droplets that are emitted with the exhaust air of the tower. Since drift droplets contain the same chemical and particulate matter of the circulating water from which they originate, they can cause numerous detrimental effects on surrounding equipment and the environment. The cooling tower industry uses drift rate to compare drift eliminator performance, a relationship that correlates droplet capture efficiency to the water circulation rate in a tower. drift eliminators are specifically designed to achieve maximum drift removal efficiency in both crossflow and counterflow tower applications with various product options available to minimize pressure drop, drift loss, cost, or a combination of all three.

Sheet Width(mm)Sheet LengthThicknessSheet Spacing145mmCustomized0.2-0.4mm25-31mm

Cooling tower drift eliminator guarantee:1. maximum operational safety;
2. legal compliance;
3. original therml performance of your eAC cooling equipment;
4. easy cleaning;
5. dry surronding by minimum drift emissionUsage of eac cooling tower drift eliminator

Packaging & Shipping
Cooling tower drift eliminator

Delivery time:within 5-15days after deposit

Package:pallet,wooden box

We Langtime supply ever types of EAC cooling tower fill as the following photo shows:

FAQ

1.Q: AreyouTradingCompanyorFactory:

A:.We areTradingCompanyand also Factory

2.Q: What'syourproductionabilityforonemonth?

A:WecanproductMetricTonsperMonth 200000 pcs.

3.Q: What'syourMOQ?

A:50pcs

4.Q:What'syourshippingport?

A:Tianjin,shanghai oranyportasyourreqirement

5.Q: What'syourPaymentTerms?

A:L/C,T/T,WesternUnion

Tryorderisacceptable.Sampleisavailable.

Welcometoinquire,wewillfeedbackwithin24hours.