Business Type:
Manufacturer/Factory
Business Range:
Fabric, PVC Flooring Tiles, SPC Flooring Tiles
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
Main Markets:
North America, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Office, School, Sports manufacturer / supplier in China, offering PVC Commercial Floor Vinyl Flooring, Polyester Spandex Blended Twill Knitting Fabric, Polyester Cationic Jersey Knitting Fabric and so on.

1
    YRS
General Supplier

China Office Floor School Floor Sports Floor

Get Latest Price
Min. Order / Reference FOB Price
150 Square Met US $6.40/ Square Met
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Usage: Commercial, Household, Sports
Function: Waterproof, Soundproof, Fire Retardant
Wear Layer: 0.5mm
PRODUCTION
Commercial Flooring
FunnyItem: FN7025Size: 3.0mm X2.0m X20mWear Layer: 0.5mmColor: CustomizedPacking: RollsKGS/SQM: 2.45Commercial places, such as office, school,rest area for sports venuesFRONT SIDE
BACK SIDEWEAR LAYER
INSTALLATIONPREPARATION BEFORE CONSTRUCTION
Unroll and lay the rolls flat for at least 24 hours prior to installation
ConDITIONS REQUIRED FOR INSTALLATION
1.The minimun temperature of subfloor should be 10°Building Hardware ;C
2.The subfloor must be flat
3.The floor must be dry, The recommended relative humidity inside the room should be 50-60%
4.The subfloor must free from marks (no felt pen, marker of any type, ballpoint pens, paint, etc., that could cause discoloration due to migration)
5.The temperature of the room should be maintainedbetween 15°C and 28°C
throughout the installation
6.The hardness of subfloorshould≥C20
LAYING DIRECTION
Plan the sheet direction for the area to be installed to ensure whenever possible that joins do not coincide with doorways, main traffic lanes, sinks or urinals. If the room is reasonably square, the sheets should run parallel to the incoming light. In long, narrow rooms it is best to install the sheets along the length of the room.
GLUING
Glue with an acrylic emulsion,apply 250 to 300 g/m² using afinelyserrated trowel. After allowing an appropriate tack time, press manually using apiece of board with arounded Boiler & Furnace edge.
WELDING
Hot welding with awelding rod is recommended forrolls and for tiles. Do not weld until the adhesive has bonded completely (wait 24 to 48 hours).
Maintenance after Installation
1.For the first 24 hours after your new floor is installed protect all the seamed areas and don't walk on the seam sealer.
2.Keep the room at20°Cor greater for at least a2 days after installation to allow the adhesives to setup properly.
3.Do not roll heavy objects dIndustrial Brake irectly on to anewly installed vinyl floor for at least 5days. This can cause the vinyl and adhesive to become compressed, once the adhesive sets up any compressed marks will become permanent. Always lay plywood or underlayment to disperse the weight of aheavy objects being moved across your vinyl floor.
4.Allow 5days before thoroughly washing your floor. This will give time for the adhesive to cure. Before placing chairs or furniture on your new vinyl floor check the condition of all casters or rollers before setting them on your floor. Replace any worn casters or rollers.General Vinyl Floor Maintenance
1.Dust, sand and grit particles are the enemy. Sweep or vacuum frequently. Don't use avacuum with abeater bar as it may scratch your floor. And don't use scrub brushes.
2.When sweeping or vacuuming does not remove the dirt, mop the floor with clean warm water. Rinse the floor thoroughly with fresh water..
3.If water alone does not clean the surface, use cleaning products recommended by the manufacturer. Most "no-rinse" cleaners will work just fine.
4.For spots or spills, wipe them up immediately and use the same technique on the spot as you would for the whole floor.
5.If you floor becomes dull looking you may need to add the manufacturer's recommended floor polish to restore the original gloss level. First, try cleaning with warm water and clear ammonia to see if there is afilm on your floor causing the dullness.
6.Never use abrasive cleaners, soaps, paste waxes, or solvents on your vinyl floor.
7.Place non-staining, walk-off mats at every outside entry to your room. This will helBall Screw p keep sand and grit from being tracked on to your floor.
Experienced Shipping Service for Exporting1. We can check the shipping price for you, and recommend shipping agents to you.
2. You could also arrange the shipping by your own forwarder agents.
3. We usually use Shanghai port as our export port, but if you want to use other sea ports, we can also arrange it for you (Nangjing, Zhangjiagang, etc. We can negotiate on the details of cost and operation)FAQ
1. Free samples and free sample analysis(not including express charges).
2. We accept small quantity order.
3. Deliver time within 25-30 days
4. The payment term should be T/T.
5. Our production is high quality, ZERO formaldehyde emission, water proof, Fire retardant,Durable,soundproof, environmental.Contact UsCompany Name: Suzhou Rynou Trading Co., Ltd.
Contact: Ms. Lynn Gu
Mobile: +86 186 0144 8160
Fax: +86-512-58905452