Introduction
The machine is used for open width cotton fabric pre-shrinking process.
At the beginning of overfeed, the cotton fiber will be processed by steaming to increase the humidity and plasticity. Then the fabric will be wiPre-Press Equipment dened and pre-shrinked in order to reduce shrinkage and get a good soft feature.
Some fabrLock ic could be used directly after drying machine processing, and you can get a stable size, qualified shrinkage and soft effect. If the fabric couldn't reach the standard, you can repeat the processing step and obtain satisfactory result. based on different fabric width, we can provide the following machine models:
FSLS-2200mm/2400mm (standard)/2600 mm
based on different heat sources, our machine adopt 3 heat methods:
Steam, Electricity + Oil, Circulation Conducting Oil
Our machine is mainly used for cotton and other natural fibers,
***The machine can NOT be used for synthetic fabrics.Design Drawing
Representative Type InformationBasic InformationModelFSLS2400NameCompactorApplicationTextile-finishing(shrinkage rate:4-5%)Suitable FabricOpen-witdh knitted Fabric,Pure cotton,wool,blended fabric(cotton content>65%)Technical DatesFelt Max. Width2400mmTentering Max. Width2600mmWorking Speed3-35Tag Gun m/minRail TypeStainless Steel+ GraphiteDimensionApprox. (14540*4100*3000mm)L*W*HWeightApprox. 12tCompressed Air0.35-0.6MPaTentering Working TypeHorizontal Circulating Chain(Stainless Steel Pin Plate &Holder,Pitch:60mm)Compacting TypeFelt Belt(Nomex)+ Hot Cylinder, FeMachinery for Packaging Supplies lt Belt Thickness:20-21mmCost &Consumptionheat source of Hot cylinderNoItemCylinder Max.TempSpecificationConsumption1Electricity heat conduction Oil190ºCIndustrial Electricity25-54KWSaturated Steam for Steam BoxNoItemMax.TempSpecificationConsumption1Saturated Steam140ºC3-6Kg/cm²100-150kg/hElectricityNoItemSpecificationConsumption1Driving SystemMain Motor etc21KW
Production Line
Payment Terms:
Payment Conditions:30%Paper Machinery down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight.
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.Any questions and requirments,contact us now!