Business Type:
Manufacturer/Factory
Business Range:
Pipe Fittings
Establishment:
2012
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
South America, Others
OEM/ODM Service
Sample Available

Pipe Fitting, Carbon Steel Pipe Fitting, Elbow manufacturer / supplier in China, offering Butt Welding A106b/A234 Wpb Mild / Carbon Steel Pipe Fitting Elbow (3" STD), Welded 90d Lr Elbow Carbon Steel, 316 ANSI B16.9 Stainless Steel Pipe Fitting 45 Degree Elbow and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Pipe Fittings Elbow Butt Welding A106b/A234 Wpb Mild / Carbon Steel Pipe Fitting Elbow (3" STD)

Butt Welding A106b/A234 Wpb Mild / Carbon Steel Pipe Fitting Elbow (3" STD)

Get Latest Price
Min. Order / Reference FOB Price
100 Piece US $1.80/ Piece
Local Area: Cangzhou, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Connection: Butt Welding
Shape: 90deg Elbow
Head Code: Bevel End Pipe Fitting
Butt welding pipe fittings - ElbowStandardsASME/ANSI B16.9, ASME/ANSI B16.11, ASME/ANSI B16.28,JIS B2311, JIS B2312, DIN 2605, DIN 2615, DIN 2616, DIN 2617, BS 4504, GOST 17375, GOST 30753, GOST 17378Bending radiusShort Radius(SR), Long Radius(LR), 2D, 3D, 5D, multipleDegree45 /90 /180, or customized degreeSize RangeSeamless type: ½" up to 28"Welded type: 28"-to 72"WT ScheduleSCH STD,SCH10 to SCH160,XS, XXS,Carbon SteelA234 WPB, WPC; A106B, ASTM A420 WPL9, WPL3, WPL6, WPHY-42WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70,Alloy SteelA234 WP1, WP11, WP12, WP22, WP5, WP9, WP91Special Alloy SteelInconel 600, Inconel 625, Inconel 718, Inconel X750, Incoloy 800,Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K500WPS 31254 S32750, UNS S32760Stainless SteelASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254Duplex stainless steelASTM A815 UNS S31803, UNS S32750, UNS S32760ApplicationsPetroleum industry, chemical, power plant, gas piping, shipbuilding. construction,sewage disposal,and nuclear power etc.Packaging materialplywood cases or pallets, or as per customer's requirementsProduction Period2-3weeks for normal orders
Production Period
We have rich experience in organizing the production and logistic, which could help us to cut the production period and ensure the supplying, so that we could meet customers' urgent demand. Besides, our timely supplying can also help customer to reduce the planned stocks reserve.
Quality Control
Quality control begins from selecting the qualified raw material supplier, then each lot of raw aterial must be re-tested at random when enter the aterial inventory.Then from the raw material cutting process, shaping, heat treatment, machining,surface treatment, packaging, all these process quality control is necessary.
Quickresponse in pre-sales and after-sales
Exact and quick offer, professional technique support, all can help the contractor orsourcing people to get the priority and opportunity in current fierce competing market. And our complete and timely after-sales solution provides the effective protection for customer.
Flexible payment term
Multiple payment terms are available for long-term and reputable customers, TT, L/C, or even L/C after sight are for option. Mutual trust is the foundation of co-operation, sometimes it may take acouple of days from the remittance toreach the beneficiary bank, when customer request avery short supplyingperiod, we could organize the production and loading first before the deposit reached. We expect long-term and good cycle of co-operation.

Contact Supplier

Mr. Daniel Lau
Sales Department
Sales Manager