Business Type:
Manufacturer/Factory
Business Range:
Filling Machine, Packing Machine, Conveyor, Water-Treatment System
Establishment:
2012
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T, WesternUnion
Main Markets:
Southeast Asia, Middle East, East Asia(Japan, South Korea), Australia, Domestic
OEM/ODM Service
Sample Available

Water Production Line, Bottle Filling Machine, Filling Line manufacturer / supplier in China, offering 40000bph Automatic Beverage Liquid Water Bottle-Blowing-Filling-Capping Combiblock Bottling Packing Filling Machine, Automatic Complete Mineral Water Plant Bottle Blowing-Filling-Capping Combiblock Machine, 2019 High Speed Automatic Pure Water Bottle Blowing Filling Capping Combiblock Machine Water Bottling Plant and so on.

1
    YRS
General Supplier
Supplier Homepage Packaging & Printing Packing Machinery Filling Machine 10000bph RO System Pet Glass Bottle Mineral Pure Water Liquid Bottling Washing Filling Capping Machi

10000bph RO System Pet Glass Bottle Mineral Pure Water Liquid Bottling Washing Filling Capping Machi

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $5000.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, WesternUnion
Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid

10000bph RO System Pet Glass Bottle Mineral Water Liquid Filling Machine Factory

Bottle Washing Part


Spring cramps are used in the bottle washing process. The empty bottles can be turned over 180° Along the conveying rail. There are two times of internal and external washing, the efficiency of bottle washing is high.Rinsing machine adopts overturn and double-opened bottle clip. Bottle clip lock the bottleneck, the material of bottle clip is SUS304, which is hygienic and durable.Bottle clip equipped with efficient spray on nozzle. The extrusive droplet with 15° Angle ensures to wash all side of the bottle, and can save the water.Made of stainless steel of superior quality.
Equipped with bottle jam protection device.

Bottle Filling Part


The design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ± 2mm (subject to bottle design). The filling valve material is SUS304. The filling system has liquid level automatic control. Filling valve lift is controlled by the valve elevator, after filling valve contact the bottleneck, it start to fill. Bottle is conveying by the wheel in the filling part.
Bottle Capping Part

Screw capping machine is most precision part in the 3-1 machine, it has a big influence to the goods stability and defective rate.

Applicablecontainers: PET bottles, glass bottles, metal cans, pull ring cans and PP bottles.

Filling principle :Gravity filling, flowmeter filling, weighing filling

Filling temperature :Room temperature

Production capacity :3000BPH -36000BPH

Description:

Thisproduct is a kind of3-in-1 unit water filling machinery for producing potable drinking water like pure water, mineral water etc.The device incorporates rinsing, filling and capping into one and is a kind of full-automatic equipment. It is suitable for producing PET and plastic bottled mineral water and purified water. The method of filling adopts gravity or micro-pressure filling which makes the filling velocity faster and more stable. Therefore, compared with similar products, this device has features of higher output and bigger benefits. The equipment is fitted with advanced Mitsubishi programmable PLC to control the operation and cooperated by frequency converter of the main motor; it makes the operation more stable and reliable. The photoelectric sensor is used to detect operating conditions of each section, which makes the operation of this equipment highly automatic and convenient.

Technical Characteristics:

1. Direct connection technology is adopted between air conveyor and bottle-feeding star wheel, and there is no bottle feeding screw and conveying chain. It is quite easy to change the bottle shape.

2. Bottleneck-hold technology is adopted for bottle conveying. While changing the bottle shape, users only need to replace the arc guide plate, star wheel and other nylon parts that are relevant to the bottle diameter.

3. The 3 in 1 unit machine incorporates rinsing, filling, and capping into one, thus making bottle wear rate lower, conveying accurate and stable, changing bottle shape more convenient.

4. The specially designed bottle gripper of rinser is made of fully stainless steel,so it is durable and firm. Besides, it doesn't contact with the screw parts of bottleneck, thus avoiding the secondary contamination.

5. The machine is designed with high-speed mass flow isobar filling valve to ensure the high filling speed and precise liquid level without any loss.

6.Components contacting with liquid are all made of high-quality stainless steel and food-grade engineering plastic, and most electrical systems adopt imported components that meet our state food hygienic standards.

7. Bottle-outputting star wheel and bottle-bottom supporting plate adopt spiral winding method, and there is no need to adjust the height of bottle conveying chain while changing the bottle shape.

Main Models:

Model

Output

XGF14-12-5

5000BPH (500ml)

XGF16-16-5

7000BPH (500ml)

XGF24-24-6

10000BPH (500ml)

XGF32-32-8

15000BPH (500ml)

XGF40-40-10

18000BPH (500ml)

XGF50-50-12

22000BPH (500ml)

XGF72-72-18

30000BPH (500ml)

XGF84-84-20

36000BPH (500ml)


Main products
1. Mineral Water/ Pure Water Filling Production Line
2. Carbonated Drink Filling Production Line
3. Juice(with pulp)/ Tea Drink Filling Production Line
4. Water treatment, Bottle Unscrambler, Sterlizer and all kinds of auxiliary equipment.
Profession in handling all kind of beverage line turnkey project!
5. Semi-auotomatic/ Full-automatic PET Bottle Blowing Machine
6. 3-5 Gallon Barrel Water Filling Production Line
Company information

Pre-salesQ&A
1.Are you atrading company or amanufacturer?
We are amanufacturer with more than 15 years experience supply the factory price machine with good quality, welcome to visit !
2.Do you have reference project?
We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see themachine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine
3.Do you have agent and after-service stations?
So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!

4.Do you have any certificate
we have been certificated by the famous cercification authority http:https://www.king-machine.com/Certificates.html

5.Do you provide turnkey project

Turnkey project available We can help you to start anew company in beverage making.Pls contact with our sales people
6.Do you provide customized service
we can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.
7.What's your guarantee or the warranty of the quality if we buy your machines?
We offer you high quality machines with 1year guarantee and supply life-long technical support.
Sale Q&A
1.What's your payment term?
We accept 30% deposit 70%TT before shipment by TT/LC/Western union
2.What's your delivery term?
We provide EXW,FOB,CFR,CIF delivery terms
3.How to test machine before delivery?
Machines testing running over 8hours, and sending testing videos.
4.How about the Packaging details?
Standard export packing, major products using export plywood case packing, small products use thick carton packing, ensure that the product packaging integrity and safety;

After sales Q&A
1.When can Iget my machine after Ipaid?
Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.2.How to install my machines when it arrives?how much the cost?
We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay round airtickets,engineer visa cost,accommodation and engineer salary USD100/day/person.3.When can iget engineers from you?
When you finish the Preparation conditions(water resource,electricity,air supply,production materials)contact with our sales people we will dispatch engineer to install the machine for you ,and train your employees to use the machine well.Normally when you preparation is done,you contact with our sales people and cooperate us to get the visa for the engineer and our engineer will be here within 15 days.4.How long time for installation?
According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.5.How about the spare parts?
We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.


for further more needs and inquiry pls contact with Miss

Contact us