Introduction of gypsum powder production line with good service:As professional manufacturer and supplier forbuilding material production lines, we DCI mainlyprovidegypsumboardproduction lines,gypsumpowderproduction lines, and gypsum block production lineswith different capacities according to client's requirements.
With our professional technical team, we can completeaseries of work from design(mechanical and electrical), manufacture, supply, installation, commissioning to stabilized production,certainly we also provide the spare part supply servOther Bags & CaWheel & Caster ses ice.
Till now, we've manufactured and supplied complete sets of machinelinesLock to Russia, Oman, Uzbekistan,United Arab Emirates, Iran.1. Controlling Part: Full Automatic2. Capacity: Gypsum Powder Plant: 30, 000-300, 000 Tons Per Year
Gypsum Board Plant: 2 Million -30 Million M2/Year3. Fuel: Coal, Natural Gas, Heavy Oil, Diesel4. Raw Material:
1)Gypsum Powder Plant:
A)Natural Gypsum Rock. Content of CaSO4@2H2O >80%.
B)Desulfurization Gypsum
C)Dephosphorization Gypsum5. Quality Standard:
1)Gypsum Powder Quality Standard: GB/T 9776-2008
Gypsum Powder: 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes
6. Main Technology
1)Gypsum Powder Plant(Nature Gypsum Rock)
Gypsum Mine - Crushing - Grinding - Calcining - Aging -Finished Products (CaSO4.1/2H2O)
Controlling PartFull Automatic / Semi-AutomaticAnnual capacityCustomized (30, 000-300, 000 Tons Per Year)CStencil alcining systemEbullition furnaceRotary kilnFuelNatural gas, diesel, coal, heavy oilRaw materialNatural Gypsum Rock (Content of CaSO4@2H2O >80%.)
Desulfurization Gypsum
Dephosphorization GypsumFinished powder usageGypsum boardPuttyPlaster powderQualiPackaging Materials ty standard80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes