Bedside Cabinet Price, Plastic Bedside Cabinet, Cheap Bedside Cabinet manufacturer / supplier in China, offering Sy-R074 Hospital Furniture Cheap Bedside Cabinet, Sy-AC048 Emergency Ambulance Ultrasound Scanner Home Mini Ultrasound, Sy-B143 China New Clinical Touch Screen Semi Auto Chemistry Analyzer and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $1250.00/ Piece |
Local Area: | Guangzhou, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Classification: | Physiological Functions of Diagnosis and Monitoring Equipment |
---|---|
Type: | Operating Table |
Certification: | CE, ISO13485 |
This type operating table is suitable for surgical operations of the head,
nEtching Machine eck, thorax, perineum, aPre-Press Equipment bdomen and extremities as well for gynaecological,
urology, ophthalmology and otorhinolary and brain surgery operations. The leg
panel can be disassembled and easily adjusted. The double skin table panel
adopted the high strength transparentColor Card & Color Comparator bCapacitor oard, which can be used for X-ray examination.
AllAuto Repair Equipment & Tools the movement of the table is controlled by electricdrive pusher with safety and reliability.
Main products:FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.