Business Type:
Manufacturer/Factory
Business Range:
Rotary Drilling Rig, Pile Driver
Establishment:
2018
R&D Capacity:
OwnBrand, ODM, OEM
OEM/ODM Service
Sample Available

Drilling Rig, Rotary Drilling Rig, Pile Drilling Rig manufacturer / supplier in China, offering 40m Hydraulic Diesel Engine Borehole Drill/Drilling Rig for Engineering Foundation Construction/Water Well/Building Pile Construction/Mining Excavating Dr-120, Diesel Hammer Pile Driver for Foundation Construction/Geotechnical Excavating Equipment/Building Pile Excavating, Hot Selling Hydraulic Rotary Drilling Rig for Building/Mining Engineering with High Torque Diesel Engine and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Engineering & Construction Machinery Pile Driver Hot Sale Construction High Quality Auger Pile Rotary Drilling Rig

Hot Sale Construction High Quality Auger Pile Rotary Drilling Rig

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $75100.00/ Set
Local Area: Beijing, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Name: Auger Pile Rotary Drilling Rig
Drilling Diameter: 500-1800m
Customized: Yes

Official manufacturer truck mounted portable hydraulic 30m depth rotary drilling rig

ProductTypeDS-30Chassis Length(mm)4550Track Width(mm)600Overall Height(M)3.4Machine Weight(t)21-25Max Drilling Depth(M)30Drilling Diameter(mm)500-1800Engine BrandYUCHAI/WEICHAI/ Cummins(Optional)Rated Motor Power(KW)126-151Max Torque of Power Head( N.m)40000-80000(Optional)RotatingSpeed of Power Head(rpm)10-60Max Main Pump Pressure of Hydraulic System(MPa)30Max Auxiliary Pump Pressure of Hydraulic System(MPa)12Max Flow Rate of Main Pump Hydraulic System( L/min)63*2-128*2( Optional )Max Flow Rate of Auxiliary Pump Hydraulic System( L/min)16Max Pressure of Pressurization System(KN)100Max Lifting Force of Pressurization System(KN)100Max Stroke of Pressurization System(mm)3000Max Lifting Force of Main Winch(KN)100Max Lifting Speed of Main Winch(m/min)50Max Lifting Force of Auxiliary Winch(KN)15Max Lifting Speed of Auxiliary Winch(m/min)50Max Lifting Capacity of Auxiliary Winch(t)1.5Angle of (Left; Right) Inclination of Drill Mast(.)+5(Front) Pitch Angle of Drill Mast (.)4Max Travel Speed of Chassis(km/h)4Max Climbing Degree of Chassis(.)30Maximum Travel Torque(N.m)25000-33000Working Status Width(mm)2600Transport Status Width(mm)2600Transport Status Height(mm)3400Type of Drill PipeMachine lock leverDrilling ToolOptional 500-1800 Drill Head, Core, etc.CustomizedYes

1.Rotary Excavator is a kind of integrated Drilling Machine, which can be used in many kinds of bottom layer, having the characteristics of high speed of hole-forming, low pollution and strong maneuverability.
2. A short spiral drill can be used for dry digging, and a rotary drill can be used for wet digging. Equipped with punching hammer, the rotary excavator can be used to drill through the hard strata.
3. It can be expanded at the bottom of the hole, If the drilling tool is used. The rotary excavator adopts multi-layer telescopic drill pipe, which has less support time and low labor intensity.
4. Do not require mud circulating slag and cost saving, which is especially suitable for the construction of urban construction.
5. Hydraulic Oil models are selected according to local climate: 34#, 46# and 68#.
6. After the first time receiving of Rotary Drilling Rig, release diesel and clean the fuel tank. According to the climate, the diesel is added for the same model: -40#, -30#, -20#, -10# and 0#.
7. After 100 hours of all engines work, release and replace engine oil.
8. After 100 hours of all engines work, release and replace the coolant of the water tank.
9. Cummins engine, please timely contact the local service station for the record, so as to maintain it in future. Otherwise all consequences will be at your own peril, when out of warranty time.
Maintenance:
1. Check whether the oil quantity is sufficient, make sure the oil quality is normal.
2. Check whether the gear oil of each reducer is sufficient, make sure the oil quality is normal.
3. Check whether there is oil leakage phenomenon, tighten the loose hose.
4. Check whether the lifting device is flexible and whether the internal butter is contaminated.
5. Check whether there are cracks, rust, out of soldering and other damage in the frame structure, tighten bolts.
6. Check the electrical wire, sensor, operation button handle and other working conditions.
7. Check whether the main and auxiliary wire rope has broken, and its connection is safe and reliable, and whether the strength of pressure rope equipment is sufficient.
8. Whether all transmission parts are fastened.
9. The engine hydraulic system will preheat for 5-20 minutes in advance, according to different climate, and check whether the instrument is normal.
10. After 100 hours of the first time work, release the Hydraulic Oil, and oil of the radiator, clean and replace the damaged filter, use 3.5 litres of diesel. Inject 160 litres of special hydraulic oil, after clean the tank (Requirements: Oil level must not less than 80% of the level gauge of the fuel tank, when stop the machine.)

FAQ

Q1: Are you a manufacturer?

A: Yes, our company was established in 1995. We are a professional Rotary Drilling Rig Manufacturer and have many years of technological exchange with Xozhou Heavy Industry Group.

Q2: What does your company produce?

A: The main products of our company include Ground Hole Drilling Machine,Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machines and other Construction Machinery, etc.

Q3: How about your delivery time?

A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, whichdepends on different products.

Q4: What methods of payment do you accept?

A: We accept T/T, L/C, D/P, D/A, etc.Of course we can have a discussion for this.