Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Bridge Bearing, Pot Bearing, China Rubber Pot Bearing manufacturer / supplier in China, offering Sliding and Fixed Bridge Pot Bearing Supplier, Customized Bottom Door Galvanized Steel Strip for Roller Door, Wholesaler Hot Rolled Galvanized Steel Coil for Roller Shutter Door and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Geosynthetics Products Geotextile 150g Nonwoven Geotextile Building Material for Road Construction

150g Nonwoven Geotextile Building Material for Road Construction

Get Latest Price
Min. Order / Reference FOB Price
300 Square Met US $0.15/ Square Met
Local Area: Nanchang, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Color: White/Black
Certification: CE
Feature: Corrosion Resistant, Oxidation Resistance, Wear-resistant

Details Specifications:

1)Material:PP/ PET (Polypropylene/Polyester)

1) Weight: 100--800g/M2

2) Thickness: 0.9mm TO 5.0mm

3) Width:50-660cm

4) Applications: construction, water conservancy, railway, road, dam bridge, waste treatment, enclosed sea to make farmland, sap projecte.Aplications:

1.Filtration The filtration layer of the dykes, river canal, seacoast, concrete slope, retaining walls. At the same time of preventing the clay granule from passing, it allows the water and the gas pass through freely.2 Separation: The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials. It isolates the soil and the gravel of two kinds different granule pathway from the groundsill or other buildings.3 Adding muscle: The highway, railway, soilstone dam, breakwater, airport, backfill soil of retaining wall, slope protection, etc in which distributes the earth stress, prevents the side-displacement of the earth body and improves the earth body stability.

4 Protection It prevents the bank from being washed out, protects the bank and the bottom, prevents the water and soil from beined away.



100

150

200

250

300

350

400

450

500

600

800

NOTE

BASIS WEIGHT TOLERANCE (%)

8

8

8

8

7

7

7

7

6

6

6

THICKNESS ≥MM

0.9

1.3

1.7

2.1

2.4

2.7

3.0

3.3

3.6

4.1

5.0

TENSILE STRENGTH AT BREAKING ≥KN/m

2.5

4.5

6.5

8.0

9.5

11.0

12.5

14.0

16.0

19.0

25.0

MD&CD

CBR PLUNGER STRENGTH ≥KN

0.3

0.6

0.9

1.2

1.5

1.8

2.1

2.4

2.7

3.2

4.0

TEARING STRENGTH ≥KN

0.08

0.12

0.16

0.20

0.24

0.28

0.33

0.38

0.42

0.46

0.60

BREADTH TOLERANCE (%)

-0.5

ELonGATION AT BREAKING (%)

25-100

MD&CD

EOS O90mm

0.07-0.2

VERTICAL PERMEABILITY (CM/S)

Kx(101~~103)

K=1.0-9.9he

PROPERTIESTEST METHODUNITMINIMUM AVERAGE VALUEJBO270JBO370JBO570JBO665JBO770Tensile Strength , MDASTM D 4595kN/m38.552.57070105.1Tensile Strength , CDASTM D 4595kN/m35.947.37096.384Elongation, MDASTM D 4595%2525252525Elongation, CDASTM D 4595%2525252525Tensile Strength at2%, MDASTM D 4595kN/m7111417.5212%, CDASTM D 4595kN/m8.612.319.32522.85%, MDASTM D 4595kN/m17.721.9353552.55%, CDASTM D 4595kN/m19.822.839.45347.1Factory Seam StrengthASTM D 4884kN/m18.425.137.552.543.8Apparent Opening SizeASTM D 4751mm0.60.430.60.430.6PermittivityASTM D 4491sec-10.70.90.40.260.04Water Flow RateASTM D 4491l/min/m2203716301222815611UV Resistance (% retained after 500 hours)ASTM D 4355%8080807080


Cooperation partner:
about us:Nanchang Jubo Engineering Material Co., Ltd
FAQ:

Q: Can I have a sample?

A: Yes, it is our pleasure to send free samples for checking quality and just undertake thefreightcharge by yourself.Q:What is the lead time for samples?
A: Current sample need 1 day, customized samples need 5-7 days,Q:What express do you use to send the samples?
A: We usually ship samples by DHL, TNT, FEDEX and UPS. It usually takes 3-5 days to arrive.Q:What is the payment terms?
A: Our usual payment term is T/T and L/C . Others could be negotiated.Q:Can you produce as my drawing?
A:Yes, we can customized for youbased on your drawing or sizes.Q:How about the delivery time?
A:Usually production time is 10-15 days. It will be decided by the order quantity.