Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Belt Conveyor, Conveyor Roller, Conveyor Pulley, Backstop, Cleaner, Buffer Bed, Belt ..
Establishment:
2000
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
Europe, Southeast Asia, Middle East, Australia
OEM/ODM Service
Sample Available

Conveyor, Belt, Material Handling manufacturer / supplier in China, offering Light/ Heavy Duty Belt Conveyor, Customerized Long Distance Conveyor, High Quality Conveyor Pulley/ Rubber Lagging, ceramic Lagging Drum, Carbon Steel Drum, Conveyor Pulley for Quarrying/Driving Pulley for Belt Conveyor and so on.

1
    YRS
General Supplier

50000h Service Life Conveyor Roller

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $1.00/ Piece
Local Area: China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Material: Steel
Application: Chemical Industry, Grain Transportation, Mining Transport, Power Plant, Port
Structure: Ordinary Roller

:
Chengke was established in 2000, 15 years of designing and manufacturing experiences in material handling industry. Now we have , Registered Capital:RMB 30,000,000,we have 3 subsidiaries: one is specialized in providing dust removal solutions to customers and the other is dedicated in supplying conveyor maintenance tools and the third is specialized in developing status and temperature monitoring products. We have more than 30 engineers andhave passed ISO9001:2008 certification in 2012 and obtained CE certificate for belt conveyor system. It takes only 1 hour from our company to Tianjin port and 30min to Beijing.Samples are acceptable. Rush order and large quantity are acceptable.
1. Brand: CK
2. Roller Diameter: 60mm-219mm.
3. Roller Length: 180mm to 3500mm.
4. Roller tube: Q235 carbon steel.
5. Shaft:Colddrawingroundsteel
6. Bearing: Deep groove ball bearing
7. Bearing clearance: C3 or C4
8. Bearing brand: SKF, NSK,FAG, HRB, LYC, ZWZ etc.
9. Seals: Non-contact labyrinth seal 10. Lift time: 50000hours
11. Production capacity: 600pcs/day.
12. Finish: painting/rubber/disc/comb/ screw/galvanized.
13. Welding: Automatic CO2 gas shielding welding.
14. Standard: GB/AS/DIN/CEMA/ISO/BS/JIS
15. Package: standard plywood cases or iron cage with protective bubble film

CK Roller-pipe--High-frequency welded roller exclusive steel pipe
--High precision and quality;
--Provided by industry well-known manufacturers
--Even thickness, good roundness, low runout
--Good dynamic and static balance performanceCK Roller-Shaft--Precise machining equipment and strict processing technology;
--The tolerance and the parameters of the shaft are higher than the national standard (GB/T 3078-1994);
--The bare pull shaft with good rigidity and corrosion resistance;
--Increased roller axis hardness extended the service lifeCK Roller-Bearing seat--Material: cold rolled strip steel with good quality;
--Processing: many times of stamping and forming, processing the end surface and the ex-circle simultaneously;
--Surface treatment: Degreasing and phosphating
-- Features: even thickness, good strength, high size precision; ensuring the concentricity and flexible rotation of the two ends of the rollerCK Roller-bearing--High quality deep grooved ball bearing with clearance of level C3 or C4.
--Put Long-term lithium grease is put into the internal space, accounting 1/2~2/3 of the total space to effectively ensure the service life of the bearing.CK Roller- seal assembly--Non-contact labyrinth seal composed of internal and external parts;
--Filling with high quality lithium grease to prevent the lubricating oil from oxidation loss;
--Good dustproof and waterproof performance;
--PA/ABS material has good stability, corrosion resistance, low water absorption rate and low possibility of deformation.1. Rotating resistanceHow to test
Run the roller for 20 min at 1450r/min, then run for 10 min at 600r/min under 250N radial load to test rotating resistance2. Radial runout How to test
Rotate the roller for one round and measure the radial runout at three axial positions then consider the Maximum value.3. Axial movement How to test
Impose 500N axial load to the end of shaft after roller assembly. 4. Water-proof&dust-proofHow to test
Install the roller in the testing device with dust and pouring water, run the roller by the motor at the speed of 600r/min.5. Reinforced service lifeHow to test
Put roller in a closed container with 2.25 times of actual load, run the roller at a speed 3 times of actual speed, run for 5h and stop for 1h, run at least 600h in such way.

Chengke was established in 2000, 15 years of designing and manufacturing experiences in material handling industry. Now we have 100 - 200 full time employees, Registered Capital:RMB 30,000,000,we have 3 subsidiaries: one is specialized in providing dust removal solutions to customers and the other is dedicated in supplying conveyor maintenance tools and the third is specialized in developing status and temperature monitoring products. We have more that 30 engineers. We have passed ISO9001:2008 certification in 2012 and obtained CE certificate for belt conveyor system. It takes only 1 hour from our company to Tianjin port and 30min to Beijing.Chengke has been dedicated in designing, manufacturing and supplying belt conveyors for 15 years for hundreds of domestic and overseas clients since 2000. There are two roller and pulley production lines in our workshop, we have two steel structure manufacture factory in Tangshan and Foshan. Quality is the life of our company and products, we have a series of roller inspection devices to ensure roller quality, such as rotating resistance, radial runout, axial movement, dust-proof &water-proof tests etc.