SizeOD1/2" -8" (21mm-273mm)Wall Thickness1.3mm-13mmSCH20, SCH40, STD, XS, SCH80, SCH160, XXSLengthLength can be customized, Maximum 8MStandardASTM A53 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and SeamlessBS4568 Galvanized Steel Conduits &AccessoriesISO 65 Carbon steel tubes suitable for screwing in accordance with ISO 7-1BS 1387 Specification for screwed and socketed steel tubes and tubulars and for plain end steel tubes suitable for welding or
For screwing to BS 21 pipe threadsBS EN 10225 steel Tubes and Tubular Suitable for Screwing to BS EN 10226 Pipe ThreadsASTM A795 Black and Hot Dipped Zinc-coated, Welded Steel Pipe for Fire Protection UseASTM A252 Pipes PilesBS 1139 metal scaffoldingJIS 3444 Carbon steel tubes for general structural purposesSteel GradeS235, S235JR, S235 G2H, S275, S275JR, S355JRH, S355J2HSt33, St37, St44, ST52JIS G3444 STK290, STK400, STK500, STK490, STK540Steel materialQ195 →SS330, ST37, ST42Q235 →SS400, S235JRQ345 →S355JR, SS500, ST52Zinc Weight40g, 60g, 80g, 100g, 120g, 270g, 400g, 500g, 550g7μm, 8μm, 15μm, 20μm, 40μm, 60μm, 70μm, 80μmUsage1)Low Pressure Liquid, Water, Gas, Oil, Line Pipe2)Construction, Structure3)Agriculture fence post, door pipe
Surface Treatment
1) Color Painted (Black /Red /Varnish coating)
2) Galvanized
3) Oiled
4) 3PE/2PE
5) Electrostatic Spraying
6) As Clients' RequirementsEnds Treatment
1) Plain Ends
2) Bevelled Ends
3) Threaded and Coupling
4) Grooved Ends
5) Welding Shoulder Ring
6)Welding Flange
7) As Clients' RequirementsPACKAGE &DELIVERY
1) PVC Packing
2) By Container
3) By Bulk Vessel
4) As Client's requirementsQUALITY CONTROL1)Before Shipping, Our professional Inspectors Will Check The Pipe's Diameter, Thickness, Length, Chemical Composition, Mechanical Properties, Zinc Coating etc, Everything is Ok, Then Will Shipping and Supply aMTC With Full Information.
2) Support The Third Party Inspection, SGS, BV and Others.
FACTORY PROFILETianjin Jinxinbao Mental Surface Treatment Co., Ltd. We were founded in 2012, with the headquarters location at the largest welded pipe production based in China-Yangjiayuan Town, Tianjin city, which is the most professional manufactuer of steel products in this area. There have total 6galvanized production lines, about 200 employees and annual production more than 200000 tons.In the 2016, in order to meet client requirements, we built aafter-processing factory, whose named is Tianjin Baojing New Energy Technology Co., Ltd, which produced all kinds of customized products and sucessful supply for many PV projects.As the export's window, Tianjin Shengteng Internatinal Trading Co., Ltd, manily exporting the factory's galvanized steel products, especially galvanized steel pipe, square and rectangular steel tube, seamless steel pipe, ERW steel pipe, galvanized steel coil/sheets, scaffolding steel props, PV mounting system.In the past, we get good feedback from old clients, and we will more fouce on the quality and improve the service to thankful each client in the future.
FAQ1)How manys days can you delivery after confriming order?
If we have stock, we can shipping within 5-7 days. If customized, usually within 30 days with normal size. Specially sizes need to confirm with factory.2) What is your payment?
1.30%TT deposit, 70% balance against with BL copy.
2.100% LC at sight /45 days or 60 days LC3)What is the product's warranty?
As long as you received our cargo within 1years, you have any problem, pls feedback to us. After cnofirming our quality cause, we will resend new pipes or give reasonable compensation for you.4) Can Ihave atrail order?
Of course, we are gald to make atrail order to show our quality and service. Getting your satification, we can try more cooperation.5) Can Ihave avist?
Welcome your visiting, we can communicate and exchange market information to develop more business.
ConTACT INFORMATIONSale Manager: Anna Wang
Phone: 0086-15502299235