Business Type:
Trading Company
Business Range:
Hydraulic Stressing Jack, Ultra-Large Rock Splitters, Hydraulic DTH Drill, Crawler Mounted ..
Establishment:
2015
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
Europe, Southeast Asia, Middle East, Africa, Domestic, Others
OEM/ODM Service
Sample Available

Hydraulic Bridge Jack, Post Tension Jack, Tensioning Jack manufacturer / supplier in China, offering Large Tonnage Post Tension Jack Tensioning PC Strands Pulling System, Cold Extrusion Steel Coupler Carbon Connetor Rebar Threading Couplers, Upset Forging Rebar Threading Coupler Connecting Coupling and so on.

1
    YRS
General Supplier

Bw250 Mud Variable Pump for Well Driling

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $5.00/ Piece
Local Area: Xian, Shaanxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Certification: CE, ISO 9001:2000
Power Source: Electric
Operation Pressure: Atmospheric Pressure

Description of BW250 piston mud pump:
BW250 Triplex Mud Pump:
Be sure that the pump foundation is level and able to support the weight of the pump.
2. Install the pump as close as possible to the mud tank or pit to reduce drop in suction line.
SUCTION SYSTEM
The diameter of the suction line must be equal to or exceed the diameter of the pump suction connection.
Use as short a suction line as possible.
3. Install the suction line in as straight a line possible. If turns are necessary use long radius ells. 4. Install a section hose in the suction line to isolate vibration.
5. Be sure there are no air traps or air leaks in the suction line.
6. Install a charging pump in the suction line. (See CHARGING PUMPS.)
7. Install a suction desurger to prevent mud cavitation. (Refer to FLUID END ACCESSORIES in Section 4 of this guide.)
8. Fully open all valves in the suction line before operating the pump.
Tips for PREPARATION:
If the pump was not completely assembled at the factory, complete the assembly as required.
2. Check to be sure the suction and discharge systems have been properly installed. (SEE INSTALLATION)
3. Remove the cover plates from the power end.
4. Inspect the power end for contamination. Clean as required.
5. Drain all condensation from the power frame (Figure 1-4). Fig. 1-4 Power end drain plug Do not attempt to drain condensation from power frame if unit has been filled with lubricant. (why?)
6. Install cover plates.
7. Check that crankcase drain plug is installed and tight. 8. Fill the power end with correct lubricant.
parameters:Maximum flow rate250L/minMaximum pressure60kg/cm2Motor power15kwThe diameter of the suction pipe64mmDrain pipe diameter50mmWeight650kg
FAQ:
Q:This is the first time Iuse this kind of machine, is it easy to operate?
A:There are English manual or teaching video that show how to use machine.
If there is still have any question, please contact us by e-mail /skype/ phone /trademanager online service at any time.Q:If machine have any problem after Ireceive it, how can Ido?
A:Free parts send to you in machine warranty period if machine have any problem.Q:What isMOQ?
A:The minimum order is 1set machine, if you order more one time, the price will be better.10 good reasons why you should buy from us?
1 we are areal factory offering products
2 free technical advice by QUALIFIED MECHANICAL ENGINEER
3 company in business for many years
4 over 50 countries customers served!
5 buy direct saving your money!
6 all machine with CE, ISO,SGS certificate.
7 machine and spindle warranty 1year.
8 our engineer can go to your country to provide technical guidance
9 we have phone support in English, if you have any questions, you can call it,
We can give you abest solution within 24 hours
10 fast delivery, save your time.
Welcome to your inquiry,we can customize for your every inquiry,thanks