Business Type:
Trading Company
Business Range:
Tube Mill, Slitting Line, Cut To Length Line, Roll Forming Machine, Cold Rolling Mill, ..
Establishment:
2018
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
Main Markets:
South America, Europe, Africa
OEM/ODM Service
Sample Available

High Frequency, Hf, High Freuency Welder manufacturer / supplier in China, offering Solid State High Frequency Welder, Steel Door Frame Roll Former, Steel, PPGI, Galvanized, Aluminum Sheet Double Layer Roll Former and so on.

1
    YRS
General Supplier

C/Z Interchangeable Roll Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set Contact Supplier
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Rolling Machine
Forging Forming Method: Mold Forging
Power Source: Electric

C-Z interchangeable machine adopts a special structure.The rollers for C & Z are changed very quickly without dismantle anything parts.One machine can produce all specifications of C & Z purlins and the widths and height can be ajustable automatically.Technical SpecificationPurlin SizeC purlin 100-300 mm
Z purlin 100-300 mmCoil Thickness1.5 - 3.0 mmPower380 V, 50 Hz, 3 phaseLine Speed12-15 m/minElectical ContralPLC
Technical Parameter1. Thickness of color steel sheet: 1.5mm-3.0mm
2. Output speed:12-15m/min
3. Material: Q195~235 cold steel,Hot zinc coil
4. Main motor power:15Kw
5. Hydraulic oil pump motor:7.5Kw, the pressure of hydraulic:15-20Mpa
6. Feeding,adjusting power:4Kw
7. Main roller stations:16 steps
8. The speed from one step to another step:15 minutes
9. Purlin size:
C purlin:100-300mm
Z purlin:100-300mm (PLC automatic adjust)
10. Roller material:Gcr15, quench
11. Main roller material:45# advanced steel, quenching and tempering
12. Frequency inverter: Panasonic
13. Computer controlling system, PLC controlling length, encoder is OMRON brand
14. Transmission type:chain drive
15. Dimension (L*W*H):11000x1800x1800(mm)
16. The weight of equipment:about 14000kg
17. Panasonic inverter ,made in Japan
18. To change from one profile to another profile it just needs 15 min to finish
19. To change from C purlin to Z purlin it just needs 30 min to finish
20. To change the cutting blade it will needs 20min to finish.