Spot Welding Equipment, Press Welding Machine, Inverter Welder manufacturer / supplier in China, offering 55kVA Inverter Welding Machine with Platform, Inverter Direct Current 660kVA Spot Welding Machine, Long Lifetime 440kVA Spot Inverter Welding Machine and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Piece | Contact Supplier |
Local Area: | Guangzhou, Guangdong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Control: | Automatic |
---|---|
Cooling Way: | Water Cooling |
Style: | Robotic |
110kVA X Type Robotic Welding machine for Car Seat Slideway
Robotic welder parameter
Model No.DB6-075-C15003-00DB6-075-C15002-00Gross weight(KG)11593Transformer rated capacity7575Throat depth*throat width(mm)70*262135*278L*H*W(mm)967*633*4231050*530*280Max. short circuit current(KA)14.614.6Max gun mouth's open(mm)10590Max electrode pressure(N)44004500Electrode deformation(mm)1.351Arm materialcoppercopper barConnecting way with robotup, down, left(or right), backwardup, down, left(or right), backwardServo Motorapply to all robot brands and can be integrated with US EXLARapply to all robot brands and can be integrated with US EXLAR
Heron own over 56,000 square meters property; developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; single phase AC welding system; offer a complete range of standard resistance welding equipments; and customize automation resistance welding production system with fixture; pursue high welding technology researching and developing all the time.
Our production lines include: press welders; manual and robotic welding guns, seam welders, bench welders; rocker arm welders ,flash butt welders, multi gun auto welder with wire feeder; customized work station, clinch system with BTM Tog-L-Loc; automatic arc welding stations etc.
With ISO9001, CCC, CE certification.
Application Industries:
Automobile & Auto Parts Manufacturing Industry.
Low-voltage Electrical Industry.
Compressor Manufacturing Industry,
Home appliance &Hardware Industry.
BTM Tog-L-L system.
FAQ
1.What's the trade terms?
A: FOB, EX-Work, CRF
2.What's the payment term?
A: a. T/T 30% as deposit, 70% should be paid before delivery.
b. L/C at sight
3. What's the delivery time?
A: 2-3 months after received 30% deposit.
4. What's the package way?
A: Wooden case
5. Which shipment port?
A: Guangzhou or Huangpu
6.How long is the guarantee?
A: For one year after customer received the machine. (It's not including the comsumables)