Business Type:
Manufacturer/Factory,Trading Company
Establishment:
2012
R&D Capacity:
OEM
Terms of Payment:
LC, T/T, WesternUnion
Main Markets:
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, ...
OEM/ODM Service
Sample Available

Full Electric Stacker Forklift 1.5 Ton, 1.5 Ton 3m 4.5m 5m Electric Reach Stacker, 1.5t Electric Pallet Truck Electric Pallet Truck manufacturer / supplier in China, offering 3 Way Forklift 48V Battery Powered Vna Electric Pallet Stacker for Intensive Storage, Factory Used Motor Single Beam Travelling Hanger Bridge Crane, Ship Deck Equipment Anchor Windlass and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Crane Overhead Crane China 150t 45m Bridge Launching Gantry Crane for Highway Construction

China 150t 45m Bridge Launching Gantry Crane for Highway Construction

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $3999999.00/ Set
Local Area: Zhengzhou, Henan, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, WesternUnion
Certification: CE, ISO9001
Condition: New
Operation Form: Air Operation+Ground Operation

800t bridge construction overhead full span launching gantry crane


Bridge girder erection machine merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, small radius curved bridge, skew bridge and tunnel bridge requirements.

The bridge girder erection machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.
The bridge girder erection machine not only can meet the standard set up, but also it can meet the cross curve erection, variable span erection, span continuous beam, composite beam, continuous steel etc. In addition to bridge erection, simply supported girder erection and point lifting, it is characterized by good stability, high efficiency, safety and reliability, variable span convenient adjustment and convenient operation and etc.
Technical parameters of girder Launcher crane:

model BGEM50/200BGEM 40/160BGEM 40/160BGEM 35/100BGEM 30/100Lifting capacity
(t)200160120100100applicable span
(m)≤55≤50≤40≤35≤30applicable skew bridge angle0-4500-4500-4500-4500-450trolley lifting speed
(m/min)0.80.80.81.270.8tolley longitudinal moving speed
(m/min)4.254.254.254.254.25cart longitudinal moving speed
(m/min) 4.254.254.254.254.25cart transverse moving speed
(m/min)2.452.452.452.452.45transportation capacity
(t)100x280 X260x250X250X2speed of bridge transport vehicle
(m/min)8.58.58.58.58.5return speed
(m/min)1717171717


Safety Features
Safety is the most important issue for cranes.To ensure the safety,the following safety devices are equipped in BL crane.
Crane traveling limit switch.
Overload protection device.
Lifting height limit device.
Voltage lower protection function .
Phase sequence protection function.
Emergency stop function.
Rain cover for outside hoist, driving units, electric cubicle.
Warining indicator : flashing nights and warning sounds.
Wire-less infra-detector for anti-collusion.

Packing/Delivery Adevices:1
Crane Beam & Main Equipment: Packaged by color strip woven plastic cloth for abrasion reduce and
moisture-proof.2Crane Kit & Electric Accessories: Export standard high quality plywood case for reduce distortion.3

Loading & Delivery Option: Prefered to choose container loading for better cost saving. Oversize beams
and equipment can be cut for container loading as suitable size crane products. Bulk cargo shipment will be
used when container loading not available.4Loading Port: Qingdao Port is prefered, Tianjin Port, Shanghai Port etc. available on your demand.5Delivery Time: Lead time 30-45days, port time 5 days, estimate time of arraival (ETA) to Xxxxxx Port 35-50 working days.


FAQ
1. What's the information should I provide when inquiry about the bridge launching tube beam launcher crane?
a.we need the Bridge Drawing, the Maximum longitudinal slope and the Maximum Transverse slope.
b.The Girder/beam drawing.
2. How many Personnel and equipment to assemble launching gantry in the worksite we need?
Personnel: 8 to 10 workers equipment
Truck crane > 50 t : 2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(12 pound and 8 pound): 1 set for each
Wrench and pincher: several
Gradienter: 1 set
3. What are inspection standard for load test of bridge launching tube beam launcher crane?
Dynamic load test: 1.1 times rated load.
Static load test: 1.25 times rated load.
4. How to make highway bridge concrete girders?
Highway Bridge concrete girders could be made by 4 methods:
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.
5. How about maintenance of bridge launching tube beam launcher crane?
a. Lubricating:Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.
b. Steel wire rope:Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.
c. Spreader: The spreader has to be checked regularly.
d. Pulley block:Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.
e. Wheels:Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness;Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.
f. Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.