Cooling Pad, Water Evaporate Cooling Pad, Greenhouse Cooling Pad manufacturer / supplier in China, offering Poultry Farm Cooling Pad Cooling System/Cooling Pad for Greenhouse, 2019 Hot Sale New Ce Approved High Quality Industrial Diesel Heater/Home Oil Heater/Auto Air Conditioner Recycling, Greenhouse Heater/Greenhouse Heating Machine and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Pieces | Contact Supplier |
Local Area: | Weifang, Shandong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, WesternUnion |
Material: | Stainless Steel |
---|---|
Usage: | for Air Conditioner |
Flow Direction: | Axial Flow |
2019 Hot Sale Greenhouse Blower Fan For Air Coolers
Greenhouse Blower Fan
Greenhouse Cooling Fan/Blower Working Principle
Greenhouse Cooling Fan/Blower Applicationany industry requiring ventilation and coolingworkshopwarehouseplant, factory, basement, garagethe fields of Livestock Breeding, Textile Industrypoultry housegreenhouse, Agriculture, Flowers and PlantsGreenhouse Cooling Fan/Blower Specifications
Model
Specifications
Diameter
blades(mm)
Blades
rotational
speed(rpm)
Motor
rotational
speed(rpm)
Airflow
(m3/h)
Total
pressure
(Pa)
Power
(W)
Height
(mm)
Width
(mm)
HL-10009006101400250007075010001000HL-110010006001400325007075011001100HL-122011004601400380007375012201220HL-1380125043914004400056110013801380HL-1530130032514005580060150015301530The company's main scope of business includes:
building and installation of glass greenhouse, PC greenhouse, film greenhouse, solar energy greenhouse, sunlight greenhouse;
production and sales of greenhouse parts;
building light steel structure;
design, plan and building of garden and park and inner greenhouse;
research and promotion of hydroponic vegetable;
research and promotion of other agricultural technology and eco-agriculture.
Contact Us
1. How long is the delivery time?
According to your ordering quantity, the delivery time is usually 5-20days.
2. How long is the warranty period?
360 days
3. Is your compay foreign trade company or manufacturer?
we are manufacturer.
4. Can you supply sample?
Small parts can be supplied, but you should pay the express.5. Can your company supply installation drawing?
Our company can supply the drawing, but you should send us your building drawing first.
6. How to intall the cooling blower?
First you can install by yourself.
If you can't install, we can send engineers to install for you. but you should be responsible for all the cost of installation.
7. When installing, what cost should we pay?
our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication
8. What is the payment terms?
usually the deposit is 30%-50% of total value. Before loading, all the balance shoulde be paid off. Or you can give your own payment terms, then we can negotiate it.