Business Type:
Manufacturer/Factory,Trading Company
Business Range:
HIFU Machine, Cryolipolysis Machine, Diode Laser Hair Removal Machine, Shockwave Therapy Machine, Body Composition Analyzer
Establishment:
2018
R&D Capacity:
OEM, ODM, Others
Terms of Payment:
LC, T/T, D/P, Paypal, Western Union
Main Markets:
North America, Southeast Asia, Mid East
OEM/ODM Service
Sample Available

1
    YRS
General Supplier
Supplier Homepage Beauty Personal CareBeauty EquipmentVacuum Cavitation System China 2022 ems abs stimulator body shaping ems electromagnetic muscle stimulation beauty equipment hip ems trainer

China 2022 ems abs stimulator body shaping ems electromagnetic muscle stimulation beauty equipment hip ems trainer

Get Latest Price
Min. Order / Reference FOB Price
10 Sets US $3050.00/ Sets
Local Area: Xian, Shaanxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, Paypal, Western Union
Brand: OEM EMS body slimming machine
Place of Origin: Shaanxi, China
Model Number: OMG91
Brand Name: OEM EMS body slimming machine

Emslim Body Sliming Muscle Weight Lose Portable Rf

Electromagnetic Machine Ems Electromagnetic

Product Details

Parts ListNopartQTYunit1Host (qualified product)1PCS2power cord1PCS3Operating handle4PCS4Bandage (long, short)1SET5quick drain socket (pipe)1PCS6quick socket of adding water (water funnel)1PCS7warranty card1PCS8use manual1PCSPrecautions1,After the instrument is opened, check whether the accessories are complete according tothe instrument configuration list. If you have any problems, please contact the seller.
2,The instrument must be filled with pure water before powering on. After powering on andturning on the instrument for 1-3 minutes, turn off the power switch and add pure water againto ensure that the built-in water tank of it is full(there has water overflow at the overflow outletindicates that it’s full)The instrument needs to add purified water every 3-5 days, and thepurified water needs to be replaced once a month(After adding water at first time, drainingwater and changing water)you need to add water twice according to the water adding processof "2. Instrument installation".Before powering on and after powering on, add water once afterturning on the instrument.After adding water, be sure to insert the "Quick drain socket (pipe)"into the water inlet to ensure the air circulation inside the water tank. Maintenance
1 Daily inspection
Managers must regularly inspect and control instruments and components. Whether the powersocket is reliably connected to the ground. Before use,check whether the power cord of it isdamaged,and stop using the instrument if it is damaged.
2 cleaning
Periodically cleaning the equipment to ensure the sanitation and good operation of it. You canwipe the outside of the device with a damp cloth when it’s powered off, using soapy water or aneutral detergent.
3 Fuse replacement
When replacing the fuse, in order to prevent electric shock, you must turn off the power andunplug the power plugCompany Information

Packaging & Shipping

FAQ

Contact us