Business Type:
Manufacturer/Factory
Business Range:
Pallet Rack, Shelf Rack, Drive-in Rack, Beams-Upright, Deck Shelving, Steel Pallet
Establishment:
2005
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Drive in Rack, Drive in Storage Rack, Drive in Pallet Rack manufacturer / supplier in China, offering 2t Warehouse Drive-in Storage Rack for Euro Pallet, CE-Approved Hot Sale Mobile Loading Hydraulic Dock Ramp, CE Approved Loading Ramp Hydraulic Dock Leveler and so on.

1
    YRS
General Supplier
Supplier Homepage Transportation Cargo & Storage Storage Racks China 2t Industrial Pullout Shelves Drawer Mould Rack with Lifting Crane

China 2t Industrial Pullout Shelves Drawer Mould Rack with Lifting Crane

Get Latest Price
Min. Order / Reference FOB Price
10 Sets US $200.00/ Sets
Local Area: Dongguan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Usage: Tool Rack, Beverage, Tools, Industrial
Material: Steel
Structure: Rack
2T Industrial Pullout Shelves Drawer Mould Rack with lifting crane
Top Features for mould storage
Pull - Out Shelves, with standard capacity of 2000KG per shelf
One-way pullout shelves
Pull out shelves can easily be rolled out by hand
Available with overhead crane system
Size: L1000 x D600 x H2000mm, 4 levels( half open)
L1000 x D1000 x H2000mm, 4 levels(full open)
What Sunli's competitive strength comparing with other suppliers?
1, Innovation and Design: we keep upgrading rack structure yearly
2, Product Ranges: Capable of manufacturing different racks in application
3, Automatic welding: For all conjunction of upright and beams
4, Rigidity of Steel: Our rack system is designed with safety factors 1.65( that will grantee at least 5 years quality)
Technical Descriptions for mould rack with pullout shelves


Style
Mould die storage, rack for mold storage; Pull-out storage rack

Selection
Single row,One-way pull out

Material
Q235B Steel( powder coated finish)

Dimension of rack
Half open and full open style

Colour
Blue, Green

Weight capacity
2000KG per level, we can do 800KG~3000KG/level

PackageAll items will be package with steel pallet
Corrugated paper outside protection
Services
CAD drawings for rack layout; CAD drawings for installation

Lead time
15Days or 27 Days( depends on purchase quantities)


Our design capacity
Please inform us following information to get prompt offer for mould storage rack with pullout shelves
+ How many levels of shelves per bay?
+ Row of racks( single row, back-to-back row or multiple rows)
( Please refer to the on the top)
FAQ
1, What is MOQ limitation for pullout shelves mould rack?
++ NO. But large purchase will bring competitive prices, 20FT container ( 10T~13T) is highly recommended, so that production can be better handled.
2, What is the lead time in Sunli?
++ As per 20FT container loading, manufacture time is about 21days; Regarding some customized items 25~27days will be covered.
3, What is payments methods Sunli can accept?
++ T/T and L/C are welcomed.
4, How about Sunli's sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.
5, What is warranty for Sunli's rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.