Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Wheel Loader, Skid Steer Loader, High Dump Loader, Wood Grabber, Ultra-Low Loader For ..
Establishment:
2012
R&D Capacity:
OEM
Terms of Payment:
LC, T/T, D/P, WesternUnion
Main Markets:
South America, Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Scooptram, Undeground, LHD manufacturer / supplier in China, offering Xd928 Side Seat Underground Loader LHD Scooptram Mucking Loader, 958g 5 Ton Wheel Loader for Mining, OEM Xd950g 5 Ton Wheel Loader and so on.

1
    YRS
General Supplier

China 3.0ton Mining Machinery Witn 1.7cbm Bucket for Xd935A

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $1.00/ Piece
Local Area: Taian, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, WesternUnion
Type: Universal Type
Transmission: Hydraulic Transmission
Walking Mode: Wheeled
I.Basic Equipment
1.China famous brand YTO6110/YUCHAI YC6108 engine.
2.Hydraulic transmission and hydraulic steering.
3.Countershaft power-shift gearbox ,torque converter.
4.Air over hydraulic break system ,caliper break system.
5.Wheel reduction axle, automatic bucket flat.
6.Over load protection system
7.Optional: Three-way catalytic converter, wheel protection chains
II.Specifications


ModelXD935ABucket capacity (m3 )1.7Weight (t)10Rated load (t)3.0Gear box4208Lifting time of the arms (s)≤4Hydraulic cycle time (s)≤9Traveling speed (km/h)0-35Forward gear I7-12.5Forward gear II21-35Reverse gear I0-14Reverse gear II25Max. climbing gradient30°Overall length (mm)6760Overall width(mm)1900Overall height(mm)2550Wheel base (mm)2600Wheel tread(mm)1800Max. Breakout force(KN)96Max. dumping height(mm)2740Dumping reach (mm)1070Engine modelYTO6110/YC6108Rated speed (r/min)2200Rated power(kw)92Tires type12.00-24
III. Optional Configurations:

Three-way catalytic converter+US$15004 wheel protection chains+US$1,700Joystick control+US$1,000DEUTZ turbo charge engine+US$500IV. Payment terms & Delivery time &Guarantee time
1.Payment Terms:By TT 30% deposit paid in advance, 70% balance paid before goods dispatching from the factory;
2.Delivery Time:within 20 days after receiving deposit;
3.Guarantee Time:one year or 1500 working hours which comes first after the date of B/L;
4.Shipping : 1 unit one 40HQ container;