Business Type:
Manufacturer/Factory
Business Range:
ERW Steel Pipe, Welded Steel Pipe, Carbon Steel Pipe, Steel Pipe, HFW Steel Pipe
Establishment:
2004
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
OEM/ODM Service
Sample Available

Carbon Steel Pipe, Erw Steel Pipe, Steel Pipe manufacturer / supplier in China, offering Weld Steel Pipe, Carbon steel pipes without welding according to ASTM and EN (DIN)., ASTM a672 c65 cl32 carbon steel pipe efw pipe and so on.

1
    YRS
General Supplier

China 3-Layer PE ERW Steel Pipe 508X6.35

Get Latest Price
Min. Order / Reference FOB Price
1 Ton US $550.00/ Ton
Local Area: Cangzhou, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Welded
Technique: ERW
Surface Treatment: Black Painting
3-Layer PE erw steel Pipe 508x6.35

Standards: BS EN 10219, EN 10217, EN10224, ASTM A53, A106, API, JIS G3444, and GB/T3091, GB/T9711
Steel Grades: S235-S355, L235-L355, P195-P460, GR. A, GR. B, X42 ~ X70, J55, STK400, STK500, SS400, Q195, Q215, Q235, and Q345,
OD: 219.1-660.4mm
WT: 5-22mm
Length: 20m maximum
Process Method: ERW
Surface Treatment: Varnished, 3PE, 3PP, FBE, Galvanized etc coated.
Pipe Ends: Square cut or bevelled
Package: Suitable packing according to the size of the pipes.
Usage: Oil, gas, water transportation, piling, chemical&construction use.
Supply Ability: 30000 metric tons per month.

ManufacturerHeBei Chang Feng Steel Tube Manufacturing Group CompanyTypeManufacture & Sales OEMProcessERW pipe with 3-Layer coatingsizeOuter Diameter219-660Wall Thickness3-25mmLength5-20m





Standard
ASTM A53/A53M, material A53 GR.B
API 5L, maerail A,B,X42,X46,X52,X56,X60
API 5CT, material J55,N80,P110
ASTM A519, material 1010,1045,4130,4140 etc
DIN1629, material ST37.0,ST44.0,ST52.0
DIN17175, material ST35.8,ST45.8 etc
DIN2391, material ST35,ST45,ST52
EN10305, materail E215,E235,E355Phone 86-13903172712


Package 1. Bundle packing.
2. Beveled end or plain end or varnished as per buyer's requirements.
3. Marking: as per customer's requests.
4. Painting varnish coating on the pipe.
5. Plastic caps at ends.Delivery Time 15 to 20 days or as clients requirementTrade termsEXW,FOB,CIF,CFR

ContactHebei Changfeng Steel Pipe Manufacturing Group Co.,Ltd
Hebei Corate internatioanl trading company(Branch Company of Chang Feng Group)
No 5 Bei Hai Road Economic & Technological Development Zone,CangZhou City Hebei Province.
Mobile:(0086)13903172712