Dalian Rainbow Z Machinery Co Ltd. was set up in 07 July 2017. Rainbow Z Company has enthusiastic customer service team,Careful engineering R D team, Professional manufacturing technology team,Discer...
Min. Order / Reference FOB Price | |
---|---|
1 Piece | US $100000.00/ Piece |
Local Area: | Dali, Yunnan, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, Paypal, Western Union |
Brand: | OEM |
---|
Overview
Machine model:RZ-003
Specification: 6450(L)*2200(w)*1970(H) mm
Voltage:220/380/415V,customized as per customer requiremnet ,60HZ
Power: 7KW
Machine body: Aluminum Profile Stainless steel &metal plate
Air supply:0.5MP-0.8MP
Warranty: 1year
Lead Time: 20-35days
Technical supporting: Full technical supporting to ensure customer always get products
Product Description
Flat face mask machine
The machine can produce 1-4 layer non-woven masks of ontology specification is adjustable, can produce 125-180 mm long, 80-110 mm wide mask, mask thickness adjustable within a certain range, the bridge of the nose line arbitrary adjustable length, in the case of replacement of mold can produce non-standard mask of arbitrary length, can produce single, double lines to nasal mask pack the rubber band placed on a conveyer belt box, masks at the ends of the rubber band automatic conveyor shear, welding firm, one-time completion point by machine equipment, high yield, scrap rate low, easy to operate.
Packaging & Shipping
Our Services
Company Information
FAQ
FAQ
seline; color: #4d9964;">Does the machine need to be debugged?
We have finished debugging.
seline; color: #4d9964;">We didn't use the machine. We couldn't operate it. What should we do?
We have operation instructions and videos, which are easy to learn operate.
seline; color: #4d9964;">How about MOQ?
1pcs
seline; color: #4d9964;">Can your technicians come and guide us to operate the machine?
If you buy 5sets,our technicians come and guide us to operate the machine.
seline; color: #4d9964;">
What about the lead time for mask machine?
1 pcs about 20 to 35days, more 1 pcs need to be consultated