AC Synchronou Alternator, Brushless Alternator, Double Bearing Alternator manufacturer / supplier in China, offering 50Hz 60Hz Brushless Copy Stamford Double Bearing Alternator, Ms Series 3-Phase Asynchronous Motor with Aluminium Housing, Cw250 Series Chinese Weichai Marine Inboard Diesel Engine Cw6250zlc (2000HP/1000rpm) and so on.
Min. Order / Reference FOB Price | |
---|---|
100 Piece | US $90.00/ Piece |
Local Area: | Fuzhou, Jiangxi, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Output Type: | AC Single Phase |
---|---|
Starting: | Electric Start |
Phase: | Single-Phase |
Feature: 1.Large fuel tank for hours of continuous operation 2.High quality power output 3.Qualified mechanical seal device 4.Compact in structure and convenient for carry 5.Easy starting by both recoil starting and electric starting 6.Special balancer shaft inside reduces the vibration to the minimum level
Technical DataMODELYW168F-1-LPG/EYW168F-2-LPG/EEngine type4-Stroke, 25°inclinde, single cylinder with Air-cooledBore * Stroke(mm)68*4568*54Displacement(cc)163196Max.power (hp/rpm)5.0/36006.0/3600Max torque (N.m/rpm)9.5/250012/2500Lubricating systemsplashIgnition systemT.C.IStarting systemRecoil Starting / Electric startingFuel typeLPGLube oil typeSAE10/30Oil capacity (L)0.60.6Dimension (mm)385*325*335415*325*335Gross weight (kg)14/1515/1620'FCL (pcs)756/640
How to produce engine?Package: Case/ Ply-wood packing.
Payment term: 30% T/T as deposit, 70% balance shall be paid before delivery. Or 100% irrevocable L/C at sight.
Price term: FOB, CFR, CIF, EXW
Delivery time: 20-35 working days after getting the deposit.
FAQ:
1.Q:Are you a factory or trading company?
A: We are a factory.
2.Q:Where is your factory located?
A: Our factory is in Fuan City, Fujian Province, China.
3.Q:What is the material of your products
A: Iron,Steel,plastic,etc.
4.Q:How about quality control in your factory?
A:"Quality is first, Customers are friends".
Every piece of goods is tested strictly one by one before packing.
We keep goods to meet the standard of CE,CCC, ISO9001:2000.
5.Q:How about guarantee?
A: It's within three months after goods is discharged in the destination.
During that period,if some breakdown easily spare parts need to change,my factory offers free.
For example, fuel cock,spark plug,starting hand,etc.
4 Stroke 5.5HP Single Cylinder Engine, 168f Gasoline Engine