SA302/SA302M
Mn-Mo And Mn-Mo-Ni Alloy Steel Plates for Pressure Vessels
Widely applies in petroleum, chemical industry, power plant, boiler, uses in manufacturing the reactor, the heat interchanger, the separator, the spherical tank, the oil gas storage holder, liquefies the boiler, the nuclear power reactor pressure shell, the boiler steam drum, the liquefied stone oil vapor bottle, hydroelectric power station high pressure water pipe, equipment and the component of water shell.
Steel Grade:
SA302GrA, SA302GrB, SA302GrC, SA302GrD
Heat Treatment: N, N+T
Standard: ASME SA302
Grade : SA302 Gr A, B, C, DThickness : 8mm-150mm
Width : 1000mm-4000mm
Length : 1000mm-20000mmMOQ: 1 PC
Product type : Steel plate
Delivery time : promptly ( Stock) or 10-40 days (Production)
Payment Terms: L/C, T/T, etc
Stock : Available
MTC: AvailableDelivery condition: Q+T or +NMTC: Original
More questions, please send us the email to : info@steelguang.com
Why Choose Us?
Our advantages:
1. More than 10 years Professional steel export service. Have own production line.
2. Advanced CNC machine.
3. Low cost&Quick Delivery&High quality.
4. Integrity, strength and quality of products recognized by the industry.
5. Most of our clients are international, the domestic well-known enterprises.
6. Has a complete scientific quality management system.
7. Can meet any requirements for all kinds of sheet metal processing with advanced equipment.
Q1: How can I get a sample to check your metal work quality?
Answer: After price /confirm/iation, you can require for samples to check our quality. We will provide you sample for free (value under USD35), as long as you afford the express freight.
Q2: How long can I expect to get the metal work sample?
Answer: After you pay the sample charges(if there is) and send us confirmed drawings, the sample will be ready for delivery in 5-7 working days. The samples will be sent to you via DHL, FedEx,UPS,TNT or EMS. It should arrive in 3-5 workdays. You can use your own express account or prepay us if you don't have any account.
Q3: What about the leading time for metal work mass production?
Answer: Honestly, it depends on the order quantity. Normally, 15 workdays to 30 workdays after your deposit if no the samples are /confirm/ied.
Q4: What will we do if the metal work quality is not ok ?
Answer: If the quality problem is caused by our mistake, we will make replacement order for free or pay the back product charge and handling charge back to you.
Pictures: