Synthetic Rubber, SBR 1502 Rubber Price, Raw EPDM Rubber manufacturer / supplier in China, offering Chloroprene Rubber Adhesive for Bonding Similar, High Quality Virgin & Recycled HDPE / LDPE / LLDPE Granules, Virgin Polymorph Pcl Plastic Pcl Pellets Pcl Polycaprolactone Pcl Resin/Pcl Pellets and so on.
Min. Order / Reference FOB Price | |
---|---|
1 Ton | US $1800.00/ Ton |
Local Area: | Handan, Hebei, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T |
Application: | Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Fireworks |
---|---|
Shape: | Powder |
Alloy: | Non-alloy |
Product detail:
Aluminum powderisatmomizedaluminiumbynitrogen protection.
Spherical Aluminum Powder Chemical Content
Al(%)Min
Impurity Content(%)Max
CU
Fe
Si
H2O
99.7
0.015
0.20
0.20
0.10
Advantages:
Best Quality: We guarantee our product is 100% produced by our factory, all the product is with good material and strict quality control.
Competitive price: We produce for many years, have reliable and long term relationship with raw material supplier, our machine is our fixed assests, the workers are experienced, we can control the cost better than other factories .
Support samples: All the products can be provided samples to customers.
Timely service:our sales personnel is 24 ours online ,no time difference.Product Shaft show:
Q1: Are you manufacturer ?
A: Yes,We are manufacture and have physical factory which located in Taiyuan, Shanxi Province, is awell-known company with good reputation in China.
Q2: If Ineed sample, could you support?
A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express AccoPackaging Materials unt for Freight Collect.
Boiler & Furnace
Q3: What's your MOQ ?
A: 5metric ton for each model.
Q4: What's the delivery time for samples and mass production?
A: (1). 1-2 weeks to open the new moulds and make free samples.
(2). 3-4 weeks after receipt of deposit and confirmation of the order.
Q5: What's your payment term?
A: For the fist order, we usually use 30% T/T deposit +70% T/T before loading the container.
Also we accept L/C while the first order quantity is under 100 metric tons.
For future order, we can negotiate a settlement of the payment method.
If you have another PPre-Press Equipment ower Transmission Parts question, pls feel free to contact us