Main features
Three available operation methods
1.Automatically entry and automatically reset.
2.Automatically entry and non automatically reset
3. Commutative standby
Function of controller in HATS automatic transfer switch
Contrller | Type A (built-in) | Type B (panel) | Operational voltageAC230VAC230VFrequency50/60Hz50/60HzWire Mesh Three operational positionsCommon power supply makingStandby power supply makingBoth common power supply and standby power supply breakingAutomatic operationManual remote controlHandle operationAutomatic operationTo monitor common power supply and automatic transferCheck phase lacking, voltage losingheck phase lacking,undervoltage, overvoltage and voltage losingTo monitor standby power supply and automatic transferCheck phase lacking,undervoltage, overvoltage and voltage losingTo control generatorFire fighting linkageAutomatic entry automatic resetAutomatic entry non automatic resetCommutative standbyManually remote controlCompel it to work at common power supplyCompel it to work at standby power supplyCompel it to word at "0"prositionTestBy test pushbutton on panel or control pushbuttonIndicationsOperation statAbrasive & Grinding us indication: making or breakingCommon power supply indication and standby power supply indicationMalfunctWoodworking Machinery ion tripping indicationParameters setting indicationOther functionsTransfer time delay0s,5s,15s,30s inaccuracy ≤ 5%0-255sRecovery time delay0s,5s,15s,30s inaccuracy ≤ 5%0-255sProtective function when neutral line is wrong connection (sound and light alarm)Overtime malfunction-breaking function after transfer signal sent outStandard configuration Selective functionQ1: Can I get a sample for testing?
A: Yes, we could offer free sample, but shipping cost should be paid at customers' side .
Q2: Can I print my logo on the products?
A: Yes, OEM and ODM are available.
Q3: How can I get the after-service?
A: If quality problem happen we promise re-send the item .
Q4: Do you have inspection procedures for products?
A: Our products100% self-inspection and testing before packing.
Q5: How about delivery time of the order?
A: 15-20 days after getting deposit.
Q6: How about payment terms?
A: 30% deposit, the rest payment balance against B/L copy