Business Type:
Manufacturer/Factory
Business Range:
Rubber Vulcanizing Press Machine, Open Mill, Rubber Refining Machine, Batch-Off Cooling ..
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Rubber Mixer, Mixer, Mixing Mill manufacturer / supplier in China, offering Rubber Open Mixing Mill with BV ISO SGS, Waste Tyre Stripe Cutter for Cutting Scrap Tires, Waste Tyre Splitting Cutting Machine for Scrap Tyre Recycling Plant and so on.

1
    YRS
General Supplier

China Batch-off Cooling Line Rubber Sheet Cooling System

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $40000.00/ Piece
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Certification: CE, ISO
Condition: New
Customized: Customized
Batch-off Cooling Line Rubber Sheet Cooling System
Product Details:
The batch off cooler is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.
Our Advantage:
There are two structure types: overhead and floor-standing types, whose hanging racks are vertically turning with compulsive cooling. The rubber strip hanging bar adopts step by step cylinder or motor-reducer for driving. It consists of mainframe and electrical control system. The mainframe is composed of splicer, printing, slitter, isolation cooling, lifting device, hanging strip cooling, auto wig wag section, weighing, handrail, platform and supporting bracket etc. The electrical control system consists of main control cabinets, and there're emergency stop device in key areas.
Clients can choose high or low disposition according to the practical requirements. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio≤100mm;there are three working positions for auto entering and outputting of material tray; auto rubber collecting device; auto cutter device; it has high automatization and can realize nobody operating.
The marking device with letter block auto changing function.
The slitting device can cut the rubber sheet to become 2/3/4/6 even width strips automatically.
The solution liquid volume on the rubber sheet surface can be controlled by an air knife.
The rubber sheet from the dipping tank to the rack bar conveyor through a special leading device to become very smooth and no trouble.
With the auto pick-up device for leading rubber sheet from the cooling rack bar to take-out Conveyor automatically.
With the special designed auto stacking device from the folding rubber sheet to pallet very tidy.
The pallet storing station can store 8~10 pallets with shifting-out function.
Auto lifter for transporting stacked pallets to the upper floor automatically.
Auto sampling, auto cutting, auto weighting , metal detector etc.
Specification Technology Parameter:

ModelXPG-600XPG-800XPG-900Max Rubber Sheet Width600800900The Thickness Of Rubber Sheet (mm)
4-104-106-12Linear Speed of Taking-in Sheet11~22m/min0~26m/min3~35m/minAxial Fan0.37KW 5760m3/h0.37KW 5760m3/h0.37KW 5760m3/hSwing range and frequency1.3m 10-16/min1.3m 10-16/min1.3m 10-16/minRubber strip temperature after cooling≤Room temperature+5ºC≤Room temperature+5ºC
≤Room temperature+5ºCSpeed-adjusting frequency motor of lifting deviceXWD5.5-1/23XWD5.5-1/23XWD5.5-1/23Speed-adjusting frequency motor of rubber swing deviceXWD1.1-5-1/87XWD1.1-5-1/87XWD1.1-5-1/87Rubber bar pitch160 or 101.6160 or 101.6160 or 101.6Max hanging height of rubber strip1400mm1400mm1400mm


FQA-Problems of customer concern:
about machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
about installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
about after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Contact:
Ms. Lareina Fan
Tel:+86-532-86133233
Fax:+86-532-86133233
Cell:+86-133-9639-0206