Business Type:
Manufacturer/Factory
Business Range:
Universal Testing Machine, Compression Testing Machine
Establishment:
2014
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
Main Markets:
South America, Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Sieve, Screen, Wire Mesh Sieve manufacturer / supplier in China, offering 200mm Galvanized Steel Wire Mesh Sieve, Standard Sieve, Fully Automatic Bitumen Needle Forcemeter (CXS-2801), Fully Automatic Bitumen Penetrometer (CXS-2801) and so on.

1
    YRS
General Supplier

China Bitumen Material Marshall Test

Get Latest Price
Min. Order / Reference FOB Price
1 set US $1000.00/ set
Local Area: Shaoxing, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Force Range: 0-30kn
Flow Valve Range: 0-15mm
Loading Speed: 50mm±5mm/Min

MSY-30 Bitumen Material Marshall Test
1. Summary
MSY-30 Bitumen Material Marshall Test is mainly for testing the thermal stability and the anti-plasticity distortion capacity of bitumen combined material-stability and flow value. It is applicable for Mashall stability apparatus, test of immersion Mashall and stability, and the mixing proportion design of bitumen mixture or asphalt road pavement construction quality inspection.
2. Mainl technical parameters
Force range0-30KNFlow valve range0-15mmLoading speed50mm±10mm/minMotor power370WVoltage380V
3. Test Step
1) Keep the specimen in the constant temperature water bath which has reached to the stated temperature for 30-40 min heating preservation. There must be a distance between the specimens. The bottom of the specimen should be pad up no less 5cm from the bottom of the container.
2) Put the upper and lower pressure head of the instrument into the water bath or oven to reach the same temperature. Take the pressure head out of the water bath or oven and clean the inner side. Daub a little butter on the guide bar of the lower pressure head to slide the pressure head freely. Take out the specimen and put it on the lower pressure head, cover it with the upper head, then fix it onto the instrument.
3) Fix the flow value meter on the upper pressure head, adjust the read of the meter to zero. Adjust the dial indicator on the adjustable proving ring to zero.
4) Take off the flow value meter at the moment of the load reaches to the max. value. At the same time, read the value of dial indicator and the flow value meter.
5) The time since the specimen is taken out of the water bath to reached the max. load should be not over 30 second.