18V Brushless Motor 100mm Cordless Angle Grinder
I, Product Features: CT-DAG-18001 - features a powerful four-pole, open-frame motor for 13,000 no-load rpmCT-DAG-18001 - designed with an optimized gear structure for all-day grinding tasksCT-DAG-18001- made with high-power cells delivering up to 80% more power than previous-gen 2.0 Ah batteriesCT-DAG-18001 - has an enhanced cell design for up to 20% longer runtime than previous-gen 2.0 Ah batteriesCT-DAG-18001 - charges the CORE18V to 80% in 55minutes and to 100% in 80minutesCT-DAG-18001 - includes a two-position Vibration Control side handle for comfortable controlCT-DAG-18001- optimized for metal applications with a four-pole motorCT-DAG-18001 - includes a bursLab Utensil and Disposable t-resistant wheel guard for additional protection to userCT-DAG-18001 - furnishes restart protection to prevent accidental startup when switching batteriesII, Product Spefications:ItemSpecificationsModel No.CT-DAG-18001Related Voltage - Battery18VRelated Voltage - Charger110-240VFrequency - Charger50 / 60HzBattery Capacity2000mAhNo-load speed:0 - 13,000 rpmBlade Size100mm (4")
115mm (4-1/2")
125mm (5")Packing Size650*400*305mmQtys/CTN5 SETSWeight21.4 / 20.3 KGS
III, Product Applications:
IV, Products Quality Control:
4-1, Advanced Assembly Workshop - Over 20 Assembly Lines4-2, Big Area Warehouses - Good Protection4-3, Quality Assurance
4-3-1, New Project Development Process
During new project qualification status: we do a lot of test to qualify the machine, such as Motor endurance test, Vacuum Test, Temperature rise test, Hose pull test, Leak test and Drop Test, etc..
4-3-2,Production Goods Quality Control Process
We have more than 25 quality engineers to monitor and track quality status during incoming goods, in-process and finish goods. Make sure all goods are meet customer's requirement before ship the goods.
4-3-3, Related Quality ProcePacking Machinery ss4-3-4, Related Product Certificates
All products had been certificated with CE/GS/EMC/LVD/CETL/ROHA/PAHSProduction and Samples Lead-time:
Samples Lead-time:
3-7 working days - It will be confirmed base on product requirement;
Mass Order Lead-time :
20 - 50 days - It will be determined base on actual order quantity and product requirement. It will speed a little more time for the 1st order as need to confirm all designCutter & Tongs of packing designs such as label, color box, manual, etc.