Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Metal Decoiler, Automatic Decoiler, Coil Handling Equipment manufacturer / supplier in China, offering Sheet Metal Decoiler Machine for Coil Handling Equipment, Building Material Hot Dipped Galvanized Corrugated Sheet for Roofing, Ibr&Corrugated Roof Sheet Roll Forming Machine for South Africa and so on.

1
    YRS
General Supplier

China C Steel Frame CAD Machine Light Steel Keel Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $30000.00/ Set
Local Area: Cangzhou, Hebei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Warranty: 1 Year
Certification: CE, RoHS, GS, ISO9001, SGS
Customized: Customized

C Steel frame cad Machine Light Steel Keel Forming Machine
C Steel frame cad Machine Light Steel Keel Forming Machine with steel as a raw material, by continuous cold rolling molding to produce complex profiles section, type multiple, versatile. We can according to customer design, manufacture different specifications of cold-formed, paint unit equipment.

Specifications of C Steel frame cad Machine Light Steel Keel Forming Machine
1.
Power
requirement
Type
380v/3ph/50hz
Main Motor power
5.5kw
Cutter power
5.5kw+2.3kw
2.
Forming speed(m/min)
0-30m/min max
Not include the time of cutting
3.
Forming stations
12 stations
5.
Material of rollers
CR12
6.
Thickness of structure
30mm
7
Forming shaft diameter(mm)
70
8
Drive
Gear box
9
Type of cutting
Hydraulic cutting
10.
Control system
PLC xinjie
11.
Install dimension(depend on the final design)
4.8mx0.6mx1.2m
Without panel length
12.
Total weight (Approx)
2.3T
Depend on final design
13.
Screen
Text screen /touch screen
Photo for C Steel frame cad Machine Light Steel Keel Forming Machine

about US:
More Products for Your Choose:

FAQ:
1. How long the machine could be made?- Normally speaking, light gauge steel frame machine could
be made within 45 working days. If you need machines in a hurry, we can make it for you
less than a month.
2. How to visit your company?
-a.Fly to Beijing airport:By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5
hours), then we can
pick up you.
3. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the
world.We need your machines running in order to keep your business running.