Sts Split Meter, Prepaid Meter, DIN Rail Meter manufacturer / supplier in China, offering Single Phase DIN Rail Keypad Split Prepaid/Prepayment Electrical Energy Meter, Energy Saving and Economical Type Prepaid Electricity Kwh Meter, Smart IC Card Prepayment Data Acquisition and Analysis Terminal Unit and so on.
Min. Order / Reference FOB Price | |
---|---|
20 Pieces | US $5.00/ Pieces |
Local Area: | Wuhan, Hubei, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, PayPal |
Display: | Digital |
---|---|
Installation: | Direct Connected |
Usage: | Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric E |
NameParameterStandardsIEC62053-21:2003,DL/T645-2007,
GB/T17215.321,State Grid and China Southern Grid Smart Meter StandardVoltage220V (Single Phase)Current1.5(6)A,5(20)A,5(30A),5(40)A,5(60)A,10(40)A,10(60)A,15(60)A,20(80)A,30(100)AFrequency50HzAccuracyClass 2.0Impulse Constant
(imp/kWh)6400,3200,2400,1600,1200,800,400,200Clock Accuracy≤0.5s/Day (Refer to temperature of 23 centigrade);
≤±1.0s/Day at -25 to +60 centigrade)Capacity of Lithium Battery≥1.2Ah,the working time lasts more than 5 years even if power off .Data Storage Period≥10 yearsPower Consumption≤1.5WCommunication Rate for Infrared1200BPSCommunication Rate for RS4852400BPS (Typical Value)
600BPS,1200BPS,2400BPS,4800BPS,9600BPS (optional for demand)Digital Display6+2 bits LCDWeightabout 0.8kgDimension112*160*58 mm
Features:
1. Energy Measurement:
Forward, Reversed and the sharp, peak, shoulder and off peak combination active and reactive energy, Four-quadrant.
2. Frozen Function:
Timing frozen, Instantaneous frozen, Appointed frozen, Daily frozen, Measurement, Period frozen Energy.
3. Demand Record:
MD and time of the total, Sharp, Peak, shoulder, and off-peak of forward and reversed active.
MD and time of the total, Sharp, Peak, shoulder, and off-peak of combination reactive.
MD and time of the total, Sharp, Peak, shoulder, and off-peak of four-quadrant reactive.
Forward and reversed MD and time of the total Phase A, B, C.
Real-time Measurement: Measurement of Voltage, Current, Power, PF and Phase-angle.
Time Interval and Tariff: Four-kind of Tariff supported and two-set period.
4. Event Record:
Missing voltage, under-voltage, over-voltage, missing phase, completely missing voltage, current/voltage phase sequence reversed, current/voltage imbalance, missing current, over-current, cover opened, terminal opened, programming, MD cleared, energy cleared, clock calibration, etc.
5. Reading:
Manually reading: reading the data when press the up-button and down-button.
Reading by HHU(Hand Held Unit): reading the data through Infrared by HHU.
PC reading: reading the data by PC with RS485 communication port.
Reading when power off: when the power off, the meter can be woke up by the button, and then the data can be read from LCD display or by HHU automatically.
6. Display:
LCD display with backlight. The data can be display by pressing button or recycle display automatically.
Remote communication:
Data reading
Data saving
Clock calibration
Data accounting
Events record and reporting
Abnormal Alarm
Software update by remote or local communication