Business Type:
Manufacturer/Factory
Establishment:
2003
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P
Main Markets:
North America, Europe, Africa
OEM/ODM Service
Sample Available

Oven Metal Cover Stamping Die, Stamping Die Parts, Oven Metal Parts Tooling manufacturer / supplier in China, offering Metal Parts of Refrigerator, Washing Machine , Air Conditioner ,Housing Appliances ,Auto Parts ,Electronics,Electrical,Medical ,Bus,Train,Airplane,Board,Oven, Stamping Made for Stainless Steel, Copper, Carbon Steel, Rubber, Silicone, Furniture, Sofa, Auto, Microwave Oven Door Parts&Microwave Stamping Parts (HRD-H36) and so on.

1
    YRS
General Supplier

China CNC Machining Lathe Machinery Process

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $0.43/ Piece
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P
Plastic Type: Thermosetting Plastic
Plastic Form: Dispersoid
Molding Method: Injection Molding
Mould Steel:2738HH,NAK80,738,2344,S136,SDK61,P20,PX5 etc.
Mould Life:50~100 shots
Material: PP
Cavity: 1*1
PLASTIC PARTS:
Applicable range: Automotive mould
Lead Time: 35-45 days
INJECTION MOULD:Hot runner:Yes (according to the customer's request and product style)
Standard part: Wire Mesh PUNCH, MISUMI
First trial equipment: 380T Injection Machine( moreover we also have 90-700T,750-1300T Injection Machine. There are robots for each 90-380T Injection Machine to meet the customer's bulk production requirement.
Process step: product design-CAE-3D mold design-2D drawingHand Tools -CAM-milling machine-grinder-drill-CNC-Tools & Hardware Stocks wire cutting-EDM-polishing-trial assembly-grind-assemble-first trial
PRODUCTION PROCESS:Our service: product and mould design, Injection mould and parts machining.
Our main customer: Haier, Hisense, Midea, Siemens, SANYO, ELX, Toyota, Kia, Foton, GM Wuling, Great wall, Hyundai, Skyworth.
Overseas market: Japan, Korea, Thailand, Russia, Germany, England, Norway, Italy, USA, Spain, Turkey, Denmark, Brazil, Argentina, Egypt, South Africa, Iran,Pakistan,India.
Mould painting: according to Customer's requestThe first trial success rate is above 95%
Quotation : provide quotation in 24hours after received the customer's drawing .
Design software: 2D/3D drawing or samples
Manager: Concentrate on project tracking and after service
Engineer: 30-50 excellent engineers, have many years experience and English communicating well.
The purchase department use EPR system to make sure buying materials in time.
70-130 experienced workers can meet the customer request of batch production.
Quality department:15 members quality control workers, testing the mould and parts by CMM and projector.
Domestic delivery: logistics transportation
Delivery to overseas: FOB/CIF/DDU by sea shipping or air shipping
Packing: Wooden Case