Carbon Steel Low Alloy Steel Plate Q345 S355JR 1.0045 SS490
Q345 steel is one mainly of Carbon and low alloy steel , usually it is produced in hot rolled state, hot rolled steel plate, hot rolled steel coil/sheet, it has comprehensive mechanical and welding property, as it shows good performance in structural purposes, it is widely used as welding structural part in manufacturing of ship, railway and vehicles, bridges, boiler, pressure vessel container, steel oil tank, etc. Yield point of Q345 steel plate decreases as plate thickness increases.
Properties:
1. Low alloy structural steel
2. Good mechanical properties
3. Delivered in hot rolled or normalizing state
4. Low temperature performance, plasticity and good weldability
5. Can be used in areas where its temperature is above -40 ºC
Equivalent grades ofsteelQ345( only for reference)
EU USAGermanyJapanEnglandChinaS355JRA572
A678Gr.A
SSGrade50
St52-3
SM490A
SS490
50B
Q345
Q345 Steel Chemical Composition:
Steel StandardSteel GradeChemical CompositionC≤MnSi≤P≤S≤VNbTiAl≥Q345A0.0201.00~1.600.550.0450.0450.02~0.150.015~0.0600.20-B0.0201.00~1.600.550.0400.0400.02~0.150.015~0.0600.20-C0.0201.00~1.600.550.0350.0350.02~0.150.015~0.0600.200.015D0.0201.00~1.600.550.0300.0300.02~0.150.015~0.0600.200.015E0.0201.00~1.600.550.0250.0250.02~0.150.015~0.0600.200.01
about GUANGZHOU CHANGFENG STEEL CO.,LTD
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and trading company. We specialized in plastic mould steel,hot work mould steel,cold work mould steel,alloy steel for mechanical,high speed steel, etc. All material are with high quality and competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as SGS, CE,ISO if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 30-50days (depend on the quantity)after receiving your prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C or Trade Assurance.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.
Why Choose Us
Warehous
Processing
Strict Quality Control