Business Type:
Trading Company
Business Range:
Filling Machine, Beverage Machine
Establishment:
2010
R&D Capacity:
ODM, OEM, Other
Terms of Payment:
LC, T/T
Main Markets:
South America, Africa, Domestic
OEM/ODM Service
Sample Available

Mineral Machinery, Packing Machine, Water Bottling Machine manufacturer / supplier in China, offering Full Automatic Mineral Liquid Water Pet Bottle Washing Filling Capping Bottling Machine, Automaic Rcgf16126 Bottled Juice Filling Machine, Beer Pop Cans Filling Machine and so on.

1
    YRS
General Supplier
Supplier Homepage Packaging & Printing Packing Machinery Filling Machine China Carbonated Beverage Bottling Producing Line with Ce

China Carbonated Beverage Bottling Producing Line with Ce

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10000.00/ Piece
Local Area: Jian, Jiangxi, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid

Carbonated Beverage Bottling Producing Line With CE

Characteristics:
1. The series equipment is used in production gas containing water of PET polyester bottle-packing carbonated beverage.
2. It carries out washing bottle, filling and capping on one machine.
3. The whole machine designing is reasonable.
4. The appearance is beautiful and the maintenance is convenient.
5. It adopts bottle handing technology to make changing bottle more convenient, faster and easier.
6. The main machine adopts advanced PLC control, touch screen and no-bottle, no-cap system.
7. The key electric elements are from famous international brand.

ModelDCGF16-12-6DCGF18-18-6DCGF24-24-8DCGF32-32-10DCGF40-40-12Production Capability(500ml b/h)2000-30003000-50005000-70007000-1000010000-15000Filling precision≤+5mm(Liguid Level)Filling pressure(Mpa)≤0.4PET bottle specification(mm)Bottle diameter:Ø50- Ø100; Height:150-310Suitable cap shapePlastic Screw CapTotal Power(kw)4.45.26.26.27.5Weight(kg)25003500450060007200Dimension (mm)2250x1650x22502600x1965x22502980x2200x22503880x2200x22504000x2250x2500

Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.

While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.

When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.

2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.
Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.

2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight