Business Type:
Manufacturer/Factory
Establishment:
2012
R&D Capacity:
OwnBrand(SKE)
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment, MoneyGram
OEM/ODM Service
Sample Available

Rubber Belt Conveyor, Mobile Conveying Belt, Ship Loader Belt manufacturer / supplier in China, offering Mobile Rubber Belt Conveyor Chinese Manufacturer, Ske Coal Mining EPC Project Blet Conveyor, Ske Heavy Duty Belt Conveyor with Belt Width 500mm~2600mm and so on.

1
    YRS
General Supplier

China Cement Ball Mill for Making Cement Powder

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $10000.00/ Piece
Local Area: Shanghai, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment, MoneyGram
Type: Grinding Mill
Motor Type: AC Motor
Motor Power: 30KW
Cement Ball Mill for Making Cement Powder
Feed Size: ≤20-≤25mm
Capacity:0.9-353t/h
Processible Materials:Gypsum, limestone, clinker,etc.
Application:Cement, silicate product, new building materials, refractory materials, chemical fertilizer, ferrous and non-ferrous metals, glass ceramic, etc.

Overview Cement Ball Mill for Making Cement Powder
Ball mill is mainly used for grinding in mining (metallic minerals and non-metallic minerals), cement, refractories, chemical, power plant, aluminum ,building material, glass, ceramic, steel slag and fly ash, ect. It follows more crushing and less grinding principle to save energy. The feed size to ball mill shall be smaller than 25mm, the output size can be adjusted by revising steel balls ratio.

Features of the Cement Ball Mill for Making Cement Powder

1. The new ball milling machine can save power of motor of 30-40%, lubricating oil 70%, cooling water 90%, and the comprehensive saved energy is over 40%.
2. The headstock of the ball milling machine does not need to change, which saves much maintenance costs and both time and labor.
3. The headstock adopts grease lubrication which is convenient, clean and with no heavy metal pollution.

Specifications Cement Ball Mill for Making Cement Powder

ModelSpeedBall loadingFeeding size(mm)Outputing size(mm)Capacity(t/h)Power(kw)Weight(T)(r/min)(t)Ø900x1800381.5≤200.075-0.890.65-218.53.6Ø900x3000382.7≤200.075-0.891.1-3.5224.6Ø1200x2400323.8≤250.075-0.61.5-4.84512.5Ø1200x3000325≤250.074-0.41.6-54512.8Ø1200x4500327≤250.074-0.41.6.5.85513.8Ø1500x3000278≤250.074-0.42-59017Ø1500x45002714≤250.074-0.43-611021Ø1500x57002715≤250.074-0.43.5-813224.7Ø1830x30002411≤250.074-0.44-1018028Ø1830x64002423≤250.074-0.46.5-1521034Ø1830x70002425≤250.074-0.47.5-1724536Ø2200x55002130≤250.074-0.410-2237048.5Ø2200x65002131≤250.074-0.414-2638052.8Ø2200x75002133≤250.074-0.416-2938056Ø2400x70002134.5≤250.074-0.418-3240062.8Ø2400x800020.436≤250.06-0.0818-3641081.2Ø2700x36001837≤250.074-0.419-7541083Ø2700x40002040≤250.074-0.420-7840085Ø2700x45002048≤250.074-0.422-8543089Ø3200x45001865≤250.074-0.429-140800137Ø3200x54001881.6≤250.074-0.430-180800-1000146Ø3600x45001788≤250.074-0.435-2101000190Ø3600x600017117≤250.074-0.438-2401250-1500220Ø3600x850017144≤250.074-0.445-2601800280

Working Principle Cement Ball Mill for Making Cement Powder
This machine is a horizontal type cylinder rotary device and outside the cylinder there is drive gear which drives the cylinder to rotate during the working process. Materials spirally and evenly go into the first cabin of the grinding machine through the feeding hollow shaft from the feeding device, and inside the first cabin, there are ladder lining boards or ripple lining board in which there are many steel balls with different specifications. The cylinder rotates and produces eccentric force to bring the steel balls to a certain height, and then the steel balls will fall down to impact and grind the materials. After being coarsely ground in the first cabin, the materials will go through the single-layer partition board and into the secondary cabin in which there are flat lining board, and in the lining board there are steel balls to further grind the materials. Finally the powdery materials will be discharged from the discharging grating bar to complete the powder grinding process.
Installation of the Cement Ball Mill for Making Cement Powder

Working the grinding mill
Stone Grinding Mill China manufacturer Frequently Questions:
1. How long is the date of delivery?
30 working days after payment of earnest money or depends on order quantity.
2. How long is the guarantee period of your company's stone grinding mill?
We guarantee quality of the machines (excluding wearing parts) for a period of one year from the date of trial run finish under our technician's guidance.
3. What's the after sale service of your company?
We will send engineers to guide your workers to install the machine, take trial run; the buyer should prepare the materials and tools needed, and offer necessary assistance. The actual expenses incurred for accommodation, to and from travel for the engineer, and insurance, should be borne by the buyer.

Specifications