Business Type:
Manufacturer/Factory
Business Range:
Steel Structure Products
Establishment:
2012
R&D Capacity:
OEM
Terms of Payment:
LC, T/T
Main Markets:
Domestic
OEM/ODM Service
Sample Available

Steel Structure, Prefab House, Steel Strcture Waerhouse manufacturer / supplier in China, offering Steel Structure Building Shed Workshop Prefabricated Steel Frame Warehouse, Low Cost Pre Fabricated Modern Design Ready Made Large Span Steel Structure Warehouse (TW301J), Steel Warehouse Workshop Storage with 10% Discount (TW412J) and so on.

1
    YRS
General Supplier
Supplier Homepage Construction & Decoration Building Steel & Structure Steel Structure China Civil Q355b Grade Steel Structure Workshop Metal Building Prefabricated Warehouse Portable Air

China Civil Q355b Grade Steel Structure Workshop Metal Building Prefabricated Warehouse Portable Air

Get Latest Price
Min. Order / Reference FOB Price
200 Square Met US $35.00/ Square Met
Local Area: Qingdao, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: H-Section Steel
Standard: GB
Trademark: Low-alloy High-tensile Structural Steel, XIANGTAIWEI
Product Description
1. Prefabricated: Fast and easy installation, save time and labor;
2. Customized design: different size, various layout, shape and appearance;
3. Light weight: lighter than concrete;
4. Removable
5. Environmental Friendly: recyclable, no waste produced;
6. High strength: can resistance grade 8 earthquake, water proof, fire proof, can resist strong wind and heavy snow.
7. Long life span: more than 50 years.
8. Wide span: single or multiple spans, maximum span 60m without middle columns.

Material Details

Main Components

base

Concrete and steel foundation anchor bolts

Main frame

Hot Rolled or Welded H-Section Steel

Material

Q235B, Q345B or others as per client's requests

Purlin

C/Z purlin: Size from C120~C320, Z100~Z320

Bracing

X-type or other type, angle or round pipe

Bolt

Plain or High-strength bolt

Roof & wall

EPS / Rockwool / PU Sandwich panel or colored steel sheet

Door

Electric flat door

Window

Aluminum or PVC window

Surface Coating

Anti-rust Paint or Hot Dip Galvanize

Sheet

0.3-0.8mm galvanized or color coated steel sheet

Accessories

Translucent skylight sheet, Ventilators, etc.

PVC Down pipe, Galvanized / SS304 gutter, etc.

Usages

1. Workshop, warehouse, plant, storage

2. Steel web frame structure

3. High rise building project

4. Others steel structure buildings

Packing

Main steel frame without packing load in 40' OT or 40'HQ

Roof and wall panel load in 40' HQ

Drawing

By client or RPMIC

Design Parameters

If need design from Honkae, please supply following parameters:

1) Length, width, eave height, roof apex

2) Live Load, Wind Speed, Seismic Load, Snow Load etc.

4) Quantity and sizes for doors and windows

5) Other information if necessary


Project Exhibition

Packing & Delivery
Packaging Details: Seaworthy export standard, 20' GP, 40' GP, 40' HQ, 40' OT.
Delivery Detail: 20-45 days after receiving the deposit.
about Taiwei

Qingdao Taiwei Steel Structure Co.,Ltd which founded in 2011, is a professional manufacturing enterprise that specializing in steel structure and relevant products.

Our main factory is located in Pingdu Qingdao city, which covering an area of 34000 square meters. We boasts a high-level crew including over 300 stuffs. Our products has been exported to more than 90 countries and regions
The quality of our product is ensured by the strict quality of our product is ensured by the strict quality control system during the manufacturing process from input to output.


Why Choose Us

PROFESSIonAL ENGINEER TEAM

Our professional engineer will give a best design with most reasonable price.

EXCELLENT SALES TEAM

Our salesmangar will give you the answers within 2 hours


EXPERIENCED ConSTRUCTION TEAM

We can also send the construction team to help you with the erection of the building if you need


FAQ
1.Are you a manufacturer or a trading company?

We're factory.
2.What are the payment terms?
TT will be more appreciated. 30%deposit before producing, 70% balancebefore loading .
3.What is the delivery time?
It depends on order quantities and how complicated it is.Generally speaking,the delivery time will be within 30 to 50 days after deposit.
4.How to pack the products?
We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5.How to install after the goods arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee,air tickets, accommodation, wages will be paid by buyers.