CK7720/CK7740 ZHonGXING Single Spindle Double Carriage CNC Lathe
Parameters
ItemUnitSpecificationModel No. CK7720CK7740Max Swing Diameter over Bedmm500600Max Diameter of Machining Plate Typemm240400Spindle Head Form A2-6A2-8Spindle BoremmΦ 60Φ 82Chuck 8 inch12 inchX/Z axis Rapid Moving Speedr/min≤2000≤1500Repeat Positioning Accuracymm≤0.01≤0.01CNC Synstem OptionalOptionalDimensions of Toolmm2660*1720*20603010*1840*2380Weightkg33003300
Our Factory
Our Strength
* Over 15 years manufacturing experience in CNC lathe machine.
* Quality is the life of our company, and we offer you the best high value machines.
* Export CNC machine tools to all over the world, especially to Russia, US, Europe and Middle East countries.
* Customer service is the power that drives our company forward.
Inspection
FAQ
1. Q: Where is your factory located?
A: Corporate headquarters is located in Zhejiang province Zhuji City Bu Zhen Rui Road No. 1, under the jurisdiction of Zhuji three production base. The main factory is located in Zhuji City Bu Zhen Rui Road No. 1, mainly for electrical engineering, precision machinery manufacturing, metal processing, heat treatment, paint and producing machine. Machine tool casting and heavy industry base is located in Zhuji city town Zhuyong Expressway Interchange on the south side. Logistics base is located in No. 58,West Union Road, Zhuji City.
2. Q: Can you do OEM?
A: Yes, we have the ability to do OEM / ODM to meet clients' requirements.
3. Q: How does your factory do regarding quality control?
A: Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control, In Process Quality Control, Outgoing Quality Control, Environment Control, Product Traceability System, Internal Audits & Calibration, Equipment Control & Maintenance, Control of Non-Conforming Materials and etc.
4. Q: What is your pay terms?
A: We can accept TT, 30% in advance, 70% balance against the B/L.
5. Q: What is the average delivery time?
A: Mostly, it would be within 1 week since after receiving customers' deposit. For mass production purchase order at big quantity, it could be discussed with each other case by case.