manual walking wire clamp vise for wire-cutting machine 3A-210003
1. martensitic stainless steel,corrosion-resistance.
2. for wedm,customized
3. HRC50-55
Detailed description:
version
The hold down feature prevents the work piece from lifting
Applicationaccurate clamping is possible single boby constraction,Desingned for ease of use,short and samllcompact in sizeMaterialHardenedParalelismSquarenessSUS440HRC50-55°0.005/100mm0.005/100mm
Company profile
Shenzhen Jingzuan Intelligent Manufacturing Co., Ltd. Was established in 2000 and is dedicated to manufacture 3A fast positioning fixture system, zero-point fast positioning clamping system, ball lock fast-installation fixture system, numerical control machine clamping chuck, guide sleeve and tooling and fixture. Shenzhen company covers an area of 3, 000 square meters. Jiangxi Industrial Park covers an area of 26, 000 square meters, with the factory area of 18, 000 square meters.
Company advantage
Our company has the advanced production facility introduced from Germany, LED Video Processor Switzerland, the USA and Japan, such as JUNG form grinding machine and ELB high-precision surface grinding machine of Germany, MOORE jig grinding machine of USA, internal and external grinding machine and thread grinding machine of Switzerland, and OKUMA machining center and TSUGAMI numerical control machine of Japan. The company established constant-temperature grinding room of 20± 0.5° C and high-precision constant temperature measuring center, and introduced high-precision measuring equipment, such as German ZEISS coordinate measuring machine, ZEISS tool microscope and TESA MIVRO-HITE altimeter. The staCustomized Service for Machinery ble quality and high cost performance ratio arMining Machinery e highly appreciated by domestic and overseas customers.The fully implemented ISO 9001 Quality Management System is a great asset to high-quality products of the company.
Our service
How To Order?
Step 1, please tell us what model and quantity you need;
Step 2, then we will make a PI for you to confirm the order details;
Step 3, when we confirmed everything, can arrange the payment;
Step 4, finally we deliver the goods within the stipulated time.Delivery Time
*small Order: In stockValve normally, deilver goods once payment received
*large Order: 5-7 days
*OEM Order: 7-15daysOEM logo Service
*we supply service of marked logo and wipe off logo, please note wipe logo is a little expensive.Contact us
For more details, please contact me:
Tel: +86 755 27296Pneumatic Component 210-808
Fax: +86 755 27296213
Mobile: +86 18038003233