Wall Dividers, Office Glass Wall Partitions, Partitions Separationg The Rooms manufacturer / supplier in China, offering Shaneok Free Standing Glass Room Dividers, Tempered Glass Wall Partition, Anti Static Raised Access Floor System, Ceramic Tile, OA500 Steel Network Floor, Raised Access Floor and so on.
Min. Order / Reference FOB Price | |
---|---|
100 Square Met | US $62.00/ Square Met |
Local Area: | Shanghai, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, WesternUnion |
Style: | Modern |
---|---|
Color: | Custom Color |
Certification: | CE, ISO9001, RoHS, CCC, ,ISO14001,SDS |
Product Description
1. Grade: 6063-T5
2. Size: 1200mm*2400mm
3. ModelNo.: PSNK80mm/83mm/106mm
4. Certification:ISO9001,ISO14001,SDS,CCC
Product NameElegant Wood Texture Office Partition
Wall thickness
80mm/83mm/106mm or customized
frame Material
6063-T5 Aluminium Alloy
Panel Materia
MDF/Melamine/PVC/Wood/Fire-proof board,etc
baseboard Highness
32mm/45mm
frame Width
32mm/38mm
Keel Width
32mm
Keel Material
6063-T5 Aluminium Alloy
Sealant
High strength double sided foam sticky tape,EPDM
Shock Resistance
More than 5 times
Size
1200*2400(Can be customized)
Painting methods
Anodizing,Powder Coating,Fluorocarbon Coating,etc
Color&Pattern
Customized
Service
ODM&OEM
Certificates
ISO9001,ISO14001,SDS,CCC
Products Detail
Our Service
1) Professional manufacturer and exporter with 20 years production and engineering experience;
2) Free CAD design,R&D department welcomes your OEM&ODM projects.
3) Self-developed mold and durable products.
Selling Units:Single item
Single package size: 350x150x100 cm
Single gross weight:200.0 kg
Package Type:Export carton box and wood pallet or customized packaging
Lead Time :
Quantity(Square Meter)1 - 100101 - 500501 - 2000>2000Est. Time(days)152030To be negotiated
Delivery Time
Shipped in 20 days after advance payment(T/T 30% deposit advanced,balanced before shipping)
Purchase Step
Step 1: Send an inquiry to us.
Step 2: Send detailed project drawings or dimensions to us.
Step 3: We provide the solution and quotation.
Step 4: Negotiation and details discussion.
Step 5: Place order and arrange deposit.
Step 6: Make detailed shop drawing for approval before production.
Step 7: Arrange production after the shop drawing /confirm/ied.
Step 8: Quality control and Inspection.(Production pictures will be provided for checking)
Step 9: Arrange balance
Step 10:Arrange shipping after received the balance.
Step 11:Provide shop drawing for installation
Step 12: After sales
Dimmable double glass partition with blinds,aluminium alloy glass partition
Please contact us if you have any concerns with your order. We are dedicated to 100% satisfaction and we will make sure you are happy with your purchase. We hope you will see that we offer 5-star service.
https://www.shaneok.com
https://shsnk.en.alibaba.com