Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Cold Formed Section Steel, Cold Roll Forming Machine
Establishment:
2014
R&D Capacity:
ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion
Main Markets:
Domestic
OEM/ODM Service
Sample Available

High Speed Guardrail, High Speed Road Guardrail Section manufacturer / supplier in China, offering High Speed Guardrail Steel Section for High Speed Road, Two Wave Highway Guard Rail Profile Roll Forming Machine, Roll Forming Machine for Stereo Garage Wave Plate Profile and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Building Material Making Machinery Tile Making Machine China Cold Forming Machine Roll Forming Machine Door Frame Cold Roll Forming Machine

China Cold Forming Machine Roll Forming Machine Door Frame Cold Roll Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $15000.00/ Set
Local Area: Weifang, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion
Tile Type: Glazed Steel
Certification: CE, ISO
Condition: New
Customized metal sheet roof panel roll forming machineProduct Description

The finished product of Profile Use metal Steel Tile Roll Forming Machine is widely used in the construction of various industrial plants, villages, warehouses, supermarkets, hotels, exhibition, family constrPharmaceutical Equipment & Machinery uction, shopping malls shutter doors and etc. It has the advantage of beautiful, classical appearance and grace taste.

Main Components:

Item

Name

Qty

1

5T Manual Decoiler

1

2

Feeding platform with hand cutting system

1

3

Main forming system

1

4

Hydraulic cutting system

1

5

Hydraulic pump station

1

6

Electrical motor

1

7

PLC control system

1

8

Touch screen operation

1

9

Finished products receive table

1

10

Safety shield(optional)

1

11

Hydraulic decoiler(optional)

1

12

Automatic stacker(optional)

1

PaymentMethod

30% as deposit ,balance payment after inspection while before delivery.

ProductionPeriod

30days after the 30% deposit.

Packing Method

Nude packing in the 40 feet container ,fixed well with oil rope, control cabinet and all the accessories with waterproof.

After-sell Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.

Installation

If installation is needed, the sellerwill dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Optical Lens & Instrument the sellerto get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the followingValve Parts preparation before arrival of technicians.

Position the machine in the buyer's factory.

Prepare necessary electric wiring.

Prepare material of trial running.

Provide labors for assistance and installation during installation.