Business Type:
Manufacturer/Factory
Business Range:
Powder Coating Line, Spray Paint Machine
Establishment:
2014
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
Main Markets:
South America, Europe, Southeast Asia, Middle East
OEM/ODM Service
Sample Available

Powder Coating Line, Powder Spraying Line, Coating Powder Line manufacturer / supplier in China, offering Powder Spraying Machinery Powder Coating Equipment Powder Coating Line Manufacturer, Experienced Powder Coating Line Manufacturer, Automatic Spraying Machinery for Powder Coating Line and so on.

1
    YRS
General Supplier
Supplier Homepage Chemicals Paint & Coating Other Paint & Coating China Cold Spray Coating Powder for Pick-up Truck Bed Liner

China Cold Spray Coating Powder for Pick-up Truck Bed Liner

Get Latest Price
Min. Order / Reference FOB Price
100 kg US $2.80/ kg
Local Area: Zhongshan, Guangdong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, D/P, PayPal, WesternUnion, Small-amountpayment
CAS No.: 38891-59-7
Formula: [CH(CH2cl)CH2o]N
EINECS: 38891-59-7

highly quality powder coating powder
thermosetting powder coating material
Technic data:
Main Material:Resin
Specific gravity:1.2-1.7g/cm3( depend on colors)
Average particle size:35-40 μm
Curing Schedule: 200°C 10minutes
Strength:Scratch resistance,abrasion resistance
Application method:Electrostatic spray
Application field:metalwork, furniture, electrical appliances, etc.
Storage conditions:<30ºC sealed and stored in a dry and cool environment
Validity: 18 months
Compared to the traditional liquid coatings, the advantages as follows:
Powder Coatings:
1.Just need one coat.
2.It can be recycled, utilization rate is 95%.
3.Without solvents and Volatile organic compounds,environmentally friendly.
4.It's inexpensive.
Traditional liquid coatings:
1.It need 2-3 coats, include primer, varnish,Colored paint etc.
2.It can not be recycled, utilization rate is 30%-50%.
3.It's solvent type, as high as 50%-70% solvent evaporation.
4.It's costly.
Powder Test Standard
No.ItemTechnical DataTest method1Physical
propertiesPhysical appearancedrying, no caking, no impurityVisually check2coloursame as sample showVisually check3density(g/cm³)1.2~1.8 (refer to color) 4sieved residue125μm mesh no residue left 5Colloidal process(gel stage)80-240SGB/T 169956Particle dimension10-100μm, ≥95%;
0. 5-10μm, ≤5%;
average: 30-60um 7Storage(month)Dry Cleanroom,≤27°C,6MonthsVisually check8Cure time(°C, min)200°C, 10 minGB/T 17289harmful ingredients,Pb≤90mg/Kg;
,Hg ≤60m/Kg;
,Cd≤75mg/Kg;
,Cr6+:≤60mg/Kg;
,BB:≤1000mg/Kg;
,PBDE:≤1000mg/Kg.ROSH standardConstruction requirements :
If your are currently using powder from someone else , or you are currently using our powder but different color specie, you must have your painting system completely clean before the job, that will keep you away from powder messing up and kind of failed coating or color defects by pollution issue.
1,Keep your device and work environment clean to go, that will prevent large particle to show up on coating by avoiding dust going in.
2,Recycled powder would pass through filter mesh 140 before the job
3,Workpiece must perfectly pass through pretreatment stage to make sure no residue left but that phosphate film ready to go, no grease, no rust,nothing left to fail adhesion force.
4,Electrostatic gun will have shoot voltage shift from 50kv to 90kv,Gives excellent atomization work, and spray powder equally like a even work.
5,Target Temperature 200±5ºC(workpiece temperature) 10 minutes will do curing job, do over limit would make your coating poor as far as you do.
6,Make sure your ventilation and static ground work well, so pollution will be limited in control and worker will be secured.