1. Supply list
SNParts NameQtyRemark1Middle phase arm body1 set Copper clad steel plate2Side phase arm body2 setsCopper clad steel plate3Electrode clamping device3 setsSpring disc clamping4Electrode clamp3 setsMaterial: stainless steel5Electrode contact shoe3 setsForged red copper (99.9%)6Insulating part3 setsMaterial: Epoxy glass cloth laminated board7Connecting piece3 setsBetween arm and column8Seaworthy packing, domestic transportation1 lot
Fabricated according to drawings provided by the Buyer, shall provide detailed drawings of cable adapters,
water / hydraulic pipe adapters, detailed connecting parts drawings, and rated current of electric furnace,
hydraulic working pressure, cooling water working pressure, etc
2. Delivery period: 3 months after date the manufacturer receiving down payment.
Sales:
Our Best Service For You
1. Pre sale service
A. Make technical solution
B. Send quotation, technical data sheet and drawing
C. Prepare power transmission plan, testing plan,and shipment plan
2. In sale service
A. Supervise the manufacturing schedule totally in accordance with the plan
B. Send photos to customer during every manufacturing process(hold point)
C. Inform the customer one week before testinng.
3. After sale service
A. Installation and commissioning, training the workers
B. Quick response within 12 hours any time
C. Provide 12 months gurantee period normally.
Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!