Business Type:
Trading Company
Business Range:
Excavator Parts, Hydraulic Motor, Final Drive, Mini Excavator, Hydraulic Pump, Excavator
Establishment:
2012
R&D Capacity:
OEM
OEM/ODM Service
Sample Available

Reduction Gearbox, Gearbox Assy, Gearbox Spare Part manufacturer / supplier in China, offering Swing Reducer Gearbox for Hitachi Kobelco Volvo Hyundai Case Komatsu Excavator, Excavator PC55mr Final Drive PC55mr-2 PC55mr-5 PC55mr-3 Travel Motor 22m-60-21301, Kyb Mag-26vp Final Drive Mag-26V-310-1 Mag-26vp-320-1 Mag-26V-350-1 Mag-26V-380-1 Mag-26V-340-1 Mag-26V-280-3 Mag-26vp-400 Travel Motor and so on.

1
    YRS
General Supplier
Supplier Homepage Manufacturing & Processing Machinery Engineering & Construction Machinery Excavator China Construction Equipment Hydraulic Crawler Mini Excavator 08ton 08 Ton Small Digger 800kg Excavators

China Construction Equipment Hydraulic Crawler Mini Excavator 08ton 08 Ton Small Digger 800kg Excavators

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $3500.00/ Piece
Local Area: Jining, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Type: Crawler Excavator
Usage: Mining Excavator
Bucket: Grab Shovel
Construction Equipment Hydraulic Crawler Mini Excavator 0.8ton 0.8 ton Small Digger 800kg Excavators
This machine is the smallest one among our product. It is flexible,easy transport and has favourable heat dissipation effect. It can be operated in limited space and various elevator decoration indoors. besides it can be used for planting,digging,applying fertilizer and weeding in the orchard.

Model

HC08

Total weight

800KG

Total length

2480mm

Total width

720mm

Total height

1375mm

Max.digging radius

2450mm

Max.digging depth

1200mm

Max.digging height

2350mm

Max.dumping height

1600mm

Min.ground clearance

80mm

Engine brand

CHANGCHAI

Engine model

192F

Output power

8.2Kw

Travel speed

0-1.8km/h

Climbing angle

35°


FEATURE

Smart,simple,safe.

Small and flexible,convenient for small terrain and limited space.

Structiral parts are made of stainless or plastic to prolong service life.

Easy operation,be convenient for transport.
Light with high performance.

We could supply the following spare parts.1. Hydraulic parts: hydraulic pump, main control valve, hydraulic cylinder, final drive travel motor, swing motor reducer gearbox, etc.
2. Engine parts: engine ass'y, piston, piston ring, cylinder block, cylinder head, crankshaft, turbocharger, fuel injection pump,
starting motor and alternator etc.
3. Undercarriage parts: Track roller, Carrier roller, Track link, Track shoe, Sprocket, Idler and Idler cushion etc.
4. Cab parts: operator's cab, wiring harness, monitor, controller, seat, door etc.
5. Other parts: Service kit, swing circle, engine hood, swivel joint, fuel tank, filter, boom, arm, bucket etc.
PACKAGE:
Standard export wooden case or carton packing.


DELIVERY TIME:
1-3 days after confirming order,detail delivery date should be decided according to
production season and order quantity.


FAQ:

Q: When will ship my order?A: once we get confirmation of payment, we will try our best to ship order within 24 hours.Q: How long does it take to my address?A: The Normal delivery time is 4-7 days, depending on which country you are in.Q: How can I track my order?A: We will send you the tracking number by email.Q: If I am not satisfied with the products, can I returns goods?A: Yes, we offer exchange and repair service under warranty. Please contact us before you want to return.