Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Lightning Arrester, Ground Lead Disconnect, High Voltage Tester, DC Hipot Tester, High ..
Establishment:
2012
R&D Capacity:
OwnBrand, ODM, OEM
Terms of Payment:
LC, T/T
Main Markets:
North America, Southeast Asia, Middle East, East Asia(Japan, South Korea)
OEM/ODM Service
Sample Available

Lab Equipment, Testing Machine, Test Bech manufacturer / supplier in China, offering Custom-Made High and Low Voltage Switch Cabinet Energized Test Equipment, High-Voltage Switch Mechanical Characteristic Tester Circuit Breaker Dynamic Characteristic Tester, Multi-Function Transformer Characterisitic Tester/ Transformer Power Analyzer and so on.

1
    YRS
General Supplier
Supplier Homepage Electrical & Electronics Capacitor China Coupling Capacitor for No Partial Discharge Signal Detection

China Coupling Capacitor for No Partial Discharge Signal Detection

Get Latest Price
Min. Order / Reference FOB Price
1 Piece Contact Supplier
Local Area: Wuhan, Hubei, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T
Type: Aluminum Electrolytic Capacitor
Application: High Voltage, Partial Discharge Signal Detection
Packaging Type: Wooden Box with Wrapping Film

I.Product Description:
HZOH series coupling capacitor is used for detecting partial discharge signal during no partial discharge voltage test.
II.Product Features:
1.High precision signal processing part, adopting high performance OP for signal amplification, using the latest double integral Ad sampling technique.
2.Anti-interference performance is good, adopting special shielding technology, and the value of partial discharge is less than 5pc.
3.Safe and reliable, the high voltage arm adopts the American dupont filler material, special process irrigation and sealing, with smaller structure, lighter weight, internal partial discharge capacity is reduced to the lowest, reliability is higher.
4.With portable structure, the whole machine is made of aluminum alloy packing box to make the shell, which can be easily disassembled.Small size, light weight, easy to carry, convenient for application.
III.Product Parameters:

Measurement RangeAC 0~500kVCapacity200~8000pFDivider Ratio1000:1Voltage Coefficient0.01%kVMeasurement PrecisionAC±1.5%Frequency Range300HzInsulating MediumDuPont dry type dielectric materialEnvironment Temperature≤85%RH


IV. Company Information:
Wuhan Hezhong Electrical Equipment Manufacture Co., Ltd founded in 2002, reorganized by electrical test equipment factory of former Wuhan high voltage research institute, is a high quality equipment supplier of China State Grid. After years of continuous innovation has become as a professional production and sale electric power testing, test equipment of high-tech enterprise integrates the ability to scientific research, development, production and sales, service, with kinds of patents, its core technology is in the same industry leading lever, and cooperates with the research institutes of Tsinghua University, Peking University and Chiao Tung University. Our sales and service are all over the country and exported to America and Europe, southeast Asia markets such as USA, Singapore and other overseas markets.
1.Electrical Technology, Security Experts: with 15-years experience in manufacture of Surge(lighting) Arrest(3Kv-36Kv gap, gap-less), Intelligent Contact Withstand Voltage Test Device, DC High Voltage Generator, Ultra-low Frequency Voltage Generator, Cable Fault Tester, Automatic Loop Resistance Tester, Intelligent Large Current Generator, Microcomputer Relay Protection Tester, DC Resistance Tester, Transformer Turns Ratio Tester, Insulation Oil Withstand Voltage Tester, High Voltage Switch Mechanical Characteristics Tester, Transformer Dielectric Loss Tester, Standard Voltage Divider, Intelligent Touch Insulated Boots (Gloves) Withstand Voltage Testing Device, Partial Discharge Test System, Transformer Comprehensive Test Table and other power test, test equipment.
2.Stable and reliable quality: manufacturing process is strictly complied with ISO 9001.
3.Payment terms: TT, L/C
4.High-efficiency production: samples delivery time is within 7 days, mass production leading time is 20-30 days, it also depends on your order quantity.
5.OEM service, can provide a complete set of solution for customer's different test requirements.