Stamped Part, Stamped, Metal Stamped manufacturer / supplier in China, offering Custom Metal Press Parts Stamping Roller Safety Belt Buckle, Customized Machine Pressing Parts/Cloth Metal Accessories Stamping Lashing Buckle/Connect Buckles, OEM Auto Spare Sheet Metal Deep Drawing Stamping and so on.
Min. Order / Reference FOB Price | |
---|---|
100 Pieces | US $3.00/ Pieces |
Local Area: | Weifang, Shandong, China |
---|---|
R&D Capacity: | OEM, ODM, Other |
Payment Terms: | LC, T/T, D/P, PayPal, WesternUnion |
Type: | Cold Stamping |
---|---|
Processing Type: | Shaping Metal |
Material: | Carbon Steel |
Product type:stamping partsMaterial:Stainless steel, alloy steel, aluminumSurface treatment:brush finish, oxidation, screen printing, laser, sand blasting, galvanizedColor:Black,Red,Yellow,Blue,Pink,Natural colorPrecision tolerance:+/- 0.1
A. Raw MaterialCopper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;B. SPEC Roll material thickness is 0.05-10mm;sheet metal thickness is 0.3-20mm;C. Surface treatmentGold / Silver /Tin / Nickel / Zinc / Chromium / Copper-plating / Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis / Passivating /Deburring / Polishing / Brush according to ROHS standard;D. ApplicationAll different kinds of telecom products, loom, furniture, and so on ;E. QuotationPlease provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;F. Prototype & MouldWe make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;G. ProductionWe will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .H. PackagePlastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.