Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Automation Equipment, Shell Making Robot, Roasting Furnace, Automatic Electric Dewaxing
Establishment:
2016
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Robot, Manipulator, Machine manufacturer / supplier in China, offering Flexible Mechanical Robot for Industry Casting Robot with ISO 9001, Dongsheng Wax Melt Machine Wax Heater with Ce, Dongsheng Casting Wax Injection Agricultural Parts and so on.

1
    YRS
General Supplier

China Dongsheng Casting Semi-Automatic Cutting Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $3000.00/ Piece
Local Area: Dongying, Shandong, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Condition: New
Certification: ISO 9001:2000
Automation: Semi-Automatic

Diameter of cutting blademm400Rotate speed r/min2900Motor powerkw4Dimensionmm1500*800*1100Weightkg110VoltageThree-phase five-wire system380V 50Hz
1.Description
The equipment development Angle is one of the ideal equipment for casting cutting in the investment casting industry. It has the advantages of reasonable solid structure, convenient operation and high working efficiency, which greatly reduces the risk of cutting operation.
2.Use adjustment and maintenance of equipment
2.1.After the device is connected to the power supply, "open the electrical switch inside the control box", start the motor to observe the turning of the cutting piece after the power switch is turned on, and immediately stop the power supply to replace the phase sequence after the reversal.
Note: The cutting machine is strictly reversed operation.
2.2.Adjust the pressure range between 0.6-0.8mpa after connecting the compressed air, and then check whether the action of each cylinder is correct according to the corresponding control switch.
2.3.Adjust the required length of the workpiece to install tighten the fixing screw, place the workpiece on the fixture and clamp it reliably, adjust the cutting Angle and offset well at the same time, start the motor switching equipment to rotate and start the cutting work.
2.4.Check the tightness of triangle belt and bolt at regular intervals, and adjust them timely.
3. Transportation and installation
3.1.Avoid extrusion with other equipment during transportation
Prevent the equipment from deforming or damaging the appearance.
3.2.The equipment is fixed with anchor bolts and requires the ground to be flat.
4.Transport package
Packed with steel structure and MDF to ensure the safety of equipment during transportation.


about us
Founded in December 1993, Dongying Dongsheng Casting Co., Ltd. is one of the largest and earliest factories engaged in the development, development and production of precision casting equipment. The company is located in the hinterland of Shengli Oilfield in the beautiful Yellow River Delta.
According to the development requirements of precision casting enterprises, the company has determined the development concept of products with high efficiency, innovation, energy saving, environmental protection, high quality, safety and reliability, and is aggressive and striving to be in line with international standards. The company has passed the ISO9001: 2000 international quality management system certification and the EU CE certification. In May 2014, it was selected by the China Foundry Association as "the leading enterprise in the foundry equipment industry in China's foundry industry"
As a member of China Precision Casting Association, the company is willing to develop together with colleagues in the precision casting industry with first-class equipment, first-class service and first-class reputation, and create brilliant together.
We are the best vendor in the running market. Our own factory van make sure the stable shipping time and the best quality with a reasonable price. We also have the best service in the city, if u have any question, please feel free to connect with us.

Address: No. 17, Chuanghui Road, Oilfield Fusion Industrial Park, Niuzhuang Town, Dongying District, Dongying City, Shandong Province
Website: www.dongshengcasting.com
FAQ:
Q1: How long can it be delivered after the order is placed?
Most of our machines are customize ordered, they can be delivered within 30-60 days after the order is placed;
Q2:How can I pay for the money for the machine.
We accept 30% as a deposit and the balance need to be paid by T/T before the machine shipping out.
Q3: What should I do if I find quality problems in the process of using my product?
In case of quality problems, if you need after-sales service, you can contact us through wechat / whatsapp: for communication and solution; our engineers provide 24-hour online guidance to solve the problems.
If you need to replace the parts, we will provide them to you in the first time through international express after paid.
Q4: Can I choose to buy equipment through Made-In-China company?
If you buy our products for the first time, we will fully cooperate with your choice, and you can buy them in any way.
Q5: Does the machine have an English manual and warranty card?
Each machine has a professional English operation manual. The warranty period of our machine is one year, except for human factors or wearing parts.
In addition, we can provide electronic version of the English manual.
Q6: The delivery time of products without stock is too long for 30-60 days.
First of all, we will speed production to meet your needs.
In addition, the long delivery time is because our technicians need to carefully check and debug the equipment to ensure the quality of the machine.
Q7: What if I choose the wrong machine?
We have pre-sales engineers with rich professional knowledge. According to your products, we provide the most suitable machines and solutions. Before placing an order, we make sure you don't choose the wrong machine. If it happen, we will solve the problem with you.
Q8: Who is responsible for the installation and debugging of the machine I purchased?
We the seller are fully responsible to send our engineers within two weeks from the date of the containers arrival to the buyers factory to commissioning the machine and training the staff of the buyer, the buyer should be responsible for a round trip economy ticket, a hotel and any other necessary accommodations for the seller's engineers.