Business Type:
Manufacturer/Factory,Trading Company
Business Range:
Wall Socket, Wall Switch, Floor Socket, Extension Socket
Establishment:
2006
R&D Capacity:
ODM, OEM, Other
OEM/ODM Service
Sample Available

Face Mask, Disposable Face Mask, Surgical Mask manufacturer / supplier in China, offering Medical Disposable Protective 3-Ply Surgical Face Mask Ffp2 Mask, Medical Disposable Protective 3-Ply Surgical Face Mask Ffp2 Mask 3 Days Delivery Time, Disposable Nonwoven 3ply Surgical Face Mask for Medical/Hospital Use with Ear Loop and so on.

1
    YRS
General Supplier
Supplier Homepage Electrical & Electronics Socket & Outlet Wall Socket China Duplex Switched 5 Pin Multi Functional Wall Socket with Neon

China Duplex Switched 5 Pin Multi Functional Wall Socket with Neon

Get Latest Price
Min. Order / Reference FOB Price
1000 Pieces US $2.20/ Pieces
Local Area: Wenzhou, Zhejiang, China
R&D Capacity: OEM, ODM, Other
Payment Terms: LC, T/T, PayPal
Grounding: Standard Grounding
Type: with Safety Shutter
Rated Current: 16A
Product Name: Multifunctional Wall Socket
The switch contacts are made of high quality silver alloy material,which have a good performance against electric arc and melt weld.The on-off operations exceed 40000 times.
The socket are made of phosphor copper, which have the character of good electrical conductivity and lasting elasticity.
Specifications:

Product NameV5 Series Multifunctional Wall SocketRated Voltage250V ACRated Current16APlate MaterialRetardant PC PlasticInner Parts Material:Phosphor CopperContact Point MaterialSilver AlloySize145*86mmWeight178g


RFQ:
Q1.Are you factory?
A2.YES, we are factory.Welcome to visit us!
Q2.What is the warranty?
A2.At least 5 year warranty.
Q3.Do you accept OEM?
A3.YES. we can do OEM or ODM for customers.
Q4.What is the payment terms?
A4.T/T,L/C, DP,OA,and so on.
Q5.Which markets you export to?
A5.As 12 years experience exporter, we have customers all over the world.
Q6.What is your turnover?
A6.We have ability to produce 10,000,000pcs per year.
Q7.How about your production time?
A7.It's up to the production plan. Usually in 30days.